| BCC (Project4) | |||||
| Baseline (Scenario1) | Baseline Scenario | 70% | |||
| ExistingV2 (Scenario3) | Road Operations Scenario | 70% | |||
| EWCH_SA (Project53) | |||||
| Baseline (Scenario1) | Baseline Scenario | 70% | |||
| Existing (Scenario2) | Road Operations Scenario | 70% | |||
| 9,170 | 33.6 | 119 | N/A | |
| 7,596.4 | 30.1 | 112 | N/A | |
| Load Reduction | 1,573.6 | 3.5 | 7 | 8 |
| Priority 1 | 3.0 | 7.04 | 4 | |
| EWCH_SA (Project53) | 4.52 | |||
| BCC (Project4) | 2.52 | |||
| Total: 4 |
| AN_AS | Priority 1 | 3.0 | |
| AN_BA | Priority 1 | 3.0 | |
| AN_BR | Priority 1 | 3.0 | |
| AN_BT | Priority 1 | 3.0 | |
| AN_CO | Priority 1 | 3.0 | |
| AN_DO | Priority 1 | 3.0 | |
| AN_MA | Priority 1 | 3.0 | |
| AN_NB | Priority 1 | 3.0 | |
| AN_SU | Priority 1 | 3.0 | |
| AN1 | Priority 1 | 3.0 | |
| KG3 | Priority 1 | 3.0 | |
| KG4 | Priority 1 | 3.0 | |
| SB_JA | Priority 1 | 3.0 | |
| SB_LG | Priority 1 | 3.0 | |
| SB_TI | Priority 1 | 3.0 | |
| Total: 15 |