BCC (Project4) | |||||
Baseline (Scenario1) | Baseline Scenario | 70% | |||
ExistingV2 (Scenario3) | Road Operations Scenario | 70% | |||
EWCH_SA (Project53) | |||||
Baseline (Scenario1) | Baseline Scenario | 70% | |||
Existing (Scenario2) | Road Operations Scenario | 70% |
9,170 | 33.6 | 119 | N/A | |
7,596.4 | 30.1 | 112 | N/A | |
Load Reduction | 1,573.6 | 3.5 | 7 | 8 |
Priority 1 | 3.0 | 7.04 | 4 | |
EWCH_SA (Project53) | 4.52 | |||
BCC (Project4) | 2.52 | |||
Total: 4 |
AN_AS | Priority 1 | 3.0 | |
AN_BA | Priority 1 | 3.0 | |
AN_BR | Priority 1 | 3.0 | |
AN_BT | Priority 1 | 3.0 | |
AN_CO | Priority 1 | 3.0 | |
AN_DO | Priority 1 | 3.0 | |
AN_MA | Priority 1 | 3.0 | |
AN_NB | Priority 1 | 3.0 | |
AN_SU | Priority 1 | 3.0 | |
AN1 | Priority 1 | 3.0 | |
KG3 | Priority 1 | 3.0 | |
KG4 | Priority 1 | 3.0 | |
Total: 12 |