Basics
WCIB0031
11/22/2019
Infiltration Basin
1
1
rock-lined infiltration basin for catchments RW1 and RW2 installed 2013 with Fairview/Fairway PhIII WQIP, CASQA draw down method will be used with the runoff 1 liter water pour test as a back-up. System generated note: BMP assessment type was updated and previous version of the BMP was archived on 11/22/2019.

Benchmark & Threshold Values
Observation Type Benchmark Threshold
Infiltration Rate - User Defined Method 0.5 in/hr 60 % decline from benchmark
Wetland Vegetative Cover 0% 20%
Photos

No photos available.

Location
Assessments

This is a comprehensive list of all assessments conducted on this Treatment BMP, including assessments for the current version and the archived version(s).

Currently viewing of Download Table
Documents

No documents have been uploaded for this Treatment BMP