This is an archived version of this Treatment BMP. View the current version.
Basics
WCIF0014
11/22/2019
09/30/2020
Infiltration Basin
1
1
63LF 36" underground perferated HDPE installed in catchment WdTrib1A in 2014 as part of CIVph1 WQIP. System generated note: BMP assessment type was updated and previous version of the BMP was archived on 11/22/2019.

None
Benchmark & Threshold Values
Observation Type Benchmark Threshold
Infiltration Rate - User Defined Method 0.4 in/hr 20 % decline from benchmark
Wetland Vegetative Cover 0% 20%
Photos

No photos available.

Location
Assessments

This is a list of assessments conducted on this archived verison of the Treatment BMP. View the current version and all assessments.

Currently viewing of Download Table
Documents

No documents have been uploaded for this Treatment BMP