Basics
WCIB0039
12/1/2019
Infiltration Basin
1
1
565 SF rock dissipator (infiltration basin) installed 2006 with Incline Village Tourist/Fairway Phase II WQIP, catchment IC1-D2. System generated note: BMP assessment type was updated and previous version of the BMP was archived on 11/22/2019.

Benchmark & Threshold Values

Benchmark and Thresholds cannot be edited. To change the Benchmark and Thresholds, remove the Assessments that use these Benchmark and Thresholds, or Edit the Treatment BMP.

Observation Type Benchmark Threshold
Wetland Vegetative Cover 0% 20%
Photos

No photos available.

Location
Assessments

This is a comprehensive list of all assessments conducted on this Treatment BMP, including assessments for the current version and the archived version(s).

Currently viewing of Download Table
Documents

No documents have been uploaded for this Treatment BMP