Basics
WCIF0014
10/1/2020
Infiltration Basin
1
1
63LF 36" underground perferated HDPE installed in catchment WdTrib1A in 2014 as part of CIVph1 WQIP. System generated note: BMP assessment type was updated and previous version of the BMP was archived on 11/22/2019. Treatment BMP type adjusted to underground infiltration gallery for WY2021.

Benchmark & Threshold Values
Observation Type Benchmark Threshold
Material Accumulation using Stadia Rod - -
Photos

No photos available.

Location
Assessments

This is a comprehensive list of all assessments conducted on this Treatment BMP, including assessments for the current version and the archived version(s).

Documents

No documents have been uploaded for this Treatment BMP