Overview
Central Incline Village Phase II and East Incline Village Phase I BMP Registration
BMP Registration
Approved

01/01/2019 to 09/30/2033 (15 years)
69 credits
58 credits (84%)

Yes
Yes
No

Registration Area & BMPs
Declarations
Currently viewing of Registration Years Download Table
Credit Schedule
1/1/2019
15 years
09/30/2033
This registration includes post-2004 treatment BMPs from the Central Incline Village Phase II and East Incline Village Phase I WQIPs, and the installation of new stormwater improvements within this registration area during the next 15 years is unlikely. All improvements were in place prior to WY2019, and the establishment date of 1/1/2019 indicates the first year of the credit schedule was WY2019. The 15 year credit schedule starting in WY2019 is reasonable.

84%
58
69
PLRM Models and Load Reduction
CIVph2EIVph1BMPReg (Project55)
Baseline (Scenario1) Baseline Scenario 100%
RdOPs34 (Scenario2) Road Operations Scenario 100%
BMPwithDistFac (Scenario3) Expected Scenario 100%

28,211 109 379 N/A
21,773 92 361 N/A
7,894 35 145 N/A
Load Reduction 13,879 57 216 69
Treatment BMPs
Yes

Infiltration Basin WCIB0034to36 3,536 14 60 18 Essential No
Infiltration Basin WCIB0038 963 5 18 5 Key No
Infiltration Basin WCIF0093 410 2 7 2 Supporting No
Infiltration Basin WCIF0069 364 2 7 2 Supporting No
Treatment Vault WCTV0004 -6 0 -7 0 Supporting Yes
Cartridge Filter WCCF0013 100 1 4 0 Supporting No
Total 27

Infiltration Feature WCCD1379to1381 Key infiltrating rock-lined ditch No
Infiltration Feature WCIB0033 Key infiltrating basin No

Washoe County plans to inspect all key and essential treatment BMPs in accordance with the protocols described in the BMP RAM User Manual V2 (2ndNature, 2015). These inspections are used to assess condition/performance and initiate maintenance on an annual basis.
Inspection of all stormwater infrastructure assets occurs annually during the spring, summer or fall. Additional inspections may occur after major precipitation events. See the attached CIVph2EIVph1 BMP Registration Memo Final for underground infiltration facility and articulated block basin BMP RAM assessment protocols.
Parcel BMPs
Yes
Single Family Residential
7% 0%
6.9 0.48 0 7.0% 0.0% 37.4
6.9 0.48 0 7.0% 0.0% 37.4
6.9 5.06 0.91 73.3% 13.2% 9.9
Multi-Family Residential
19% 0%
48.7 9.25 0 19.0% 0.0% 2640.8
48.7 9.25 0 19.0% 0.0% 2640.8
49.2 17.98 0 36.5% 0.0% 2102.1
Commercial, Industrial, and Community Use
5% 0%
60.1 3 0 5.0% 0.0% 11585.3
60.1 3 0 5.0% 0.0% 11585.3
60.1 27.8 0 46.3% 0.0% 7027.3
Essential
The LT Info Stormwater Tools will be used to check the parcel BMP percentages annually for the CIVph2EIVph1 BMP Registration. If/when the percentages appear to change, Washoe County will alert TRPA that a follow up BMP Recertification may be beneficial for all parties.
The LT Info Stormwater Tools will be used to check the parcel BMP percentages annually for the CIVph2EIVph1 BMP Registration. If/when the percentages appear to change, Washoe County will alert TRPA that a follow up BMP Recertification may be beneficial for all parties.
Other Pollutant Control Strategies

No other pollutant control strategies implemented in this registration