This registration includes post-2004 treatment BMPs from two WQIPs, and the installation of new stormwater improvements within the area covered by the registration during the next 10 years is unlikely. All improvements were in place prior to WY2016 and the establishment date of 10/01/2015 indicates the first year of the credit schedule was WY2016. The 11 year credit schedule starting in WY2016 is reasonable. The golf course greens were removed from the catchments in WY2021.
large rock-lined channel treating catchment Incline3 road runoff
No
It is the responsibility of Washoe County to monitor and maintain all drainage improvements and treatment BMPs. Washoe County will maintain treatment BMPs that fail annual assessments to standards identified in the TRPA BMP Handbook. Annual assessments are used to assess condition/performance and initiate maintenance on an annual basis. Washoe County will use a vactor truck, excavator, hand crew or other methods necessary to maintain treatment BMPs at or better than expected conditions.
Washoe County plans to inspect all key and essential treatment BMPs in accordance with the protocols described in the BMP RAM User Manual V2 (2ndNature, 2015). These inspections are used to assess condition/performance and initiate maintenance on an annual basis. Additional inspections may occur after major precipitation events.
Parcel BMPs
Yes
Single Family Residential
7%
0%
301.1
21.07
0
7.0%
0.0%
387
301.6
21.11
0
7.0%
0.0%
386.9
301.6
208.83
8.4
69.2%
2.8%
236.8
Multi-Family Residential
19%
0%
46.2
8.78
0
19.0%
0.0%
1090.1
46.2
8.78
0
19.0%
0.0%
1090.1
46.2
9.2
0.16
19.9%
0.3%
970.6
Commercial, Industrial, and Community Use
5%
0%
2.7
0.13
0
4.8%
0.0%
1762.3
2.7
0.13
0
4.8%
0.0%
1762.3
2.7
0.9
0
33.3%
0.0%
966.5
Key
The LT Info SW Tools will be used to check the parcel BMP percentages annually for the FF3_UDC BMP Registration. If/when the percentages appear to change, Washoe County will alert TRPA that a follow up BMP Recertification may be beneficial for all parties.
The LT Info SW Tools will be used to check the parcel BMP percentages annually for the FF3_UDC BMP Registration. If/when the percentages appear to change, Washoe County will alert TRPA that a follow up BMP Recertification may be beneficial for all parties.