Overview
Fairview/Fairway Ph III WQIP Upper Deer Creek BMP Registration
BMP Registration
Approved

10/01/2015 to 09/30/2026 (11 years)
37 credits
37 credits (100%)

Yes
Yes
No

Registration Area & BMPs
Declarations
Currently viewing of Registration Years Download Table
Credit Schedule
10/1/2015
11 years
09/30/2026
This registration includes post-2004 treatment BMPs from two WQIPs, and the installation of new stormwater improvements within the area covered by the registration during the next 10 years is unlikely. All improvements were in place prior to WY2016 and the establishment date of 10/01/2015 indicates the first year of the credit schedule was WY2016. The 11 year credit schedule starting in WY2016 is reasonable. The golf course greens were removed from the catchments in WY2021.

100%
37
37
PLRM Models and Load Reduction
FF3UDC_Incline_BMPReg (Project72)
Baseline (Scenario1) Baseline Scenario 100%
RdOps34 (Scenario2) Road Operations Scenario 100%
BMP (Scenario3) Expected Scenario 100%
FF3UDC_Third_BMPReg (Project73)
Baseline (Scenario1) Baseline Scenario 100%
RdOps34 (Scenario2) Road Operations Scenario 100%
BMP (Scenario3) Expected Scenario 100%
FF3UDC_DeerCrK_BMPReg (Project74)
Baseline (Scenario1) Baseline Scenario 100%
RdOps34 (Scenario2) Road Operations Scenario 100%
BMP (Scenario3) Expected Scenario 100%

35,755 135 520 N/A
31,938 126 501 N/A
24,495 98 394 N/A
Load Reduction 7,443 28 107 37
Treatment BMPs
Yes

Infiltration Basin WCIB0018 577 2 8 3 Key No
Cartridge Filter CCDriveCFs 605 2 6 3 Key No
Infiltration Basin WCIB0019to23 105 1 3 1 Supporting No
Infiltration Basin WCIB0017 161 1 3 1 Supporting No
Treatment Vault WCCD0150 234 1 3 1 Supporting No
Dry Basin WCDB0007 0 0 0 0 Supporting Yes
Wet Basin WCWB0002N3 8 0 0 0 Supporting Yes
Total 9

Infiltration Feature WCIF0008 Key underground infiltration gallery treating catchment Third2 road runoff No
Infiltration Feature WCCD0151 Key vegetated channel treating catchment LwrDr1 road runoff No
Infiltration Feature WCCD0182 Essential large rock-lined channel treating catchment Incline3 road runoff No

It is the responsibility of Washoe County to monitor and maintain all drainage improvements and treatment BMPs. Washoe County will maintain treatment BMPs that fail annual assessments to standards identified in the TRPA BMP Handbook. Annual assessments are used to assess condition/performance and initiate maintenance on an annual basis. Washoe County will use a vactor truck, excavator, hand crew or other methods necessary to maintain treatment BMPs at or better than expected conditions.
Washoe County plans to inspect all key and essential treatment BMPs in accordance with the protocols described in the BMP RAM User Manual V2 (2ndNature, 2015). These inspections are used to assess condition/performance and initiate maintenance on an annual basis. Additional inspections may occur after major precipitation events.
Parcel BMPs
Yes
Single Family Residential
7% 0%
301.1 21.07 0 7.0% 0.0% 387
301.6 21.11 0 7.0% 0.0% 386.9
301.6 208.83 8.4 69.2% 2.8% 236.8
Multi-Family Residential
19% 0%
46.2 8.78 0 19.0% 0.0% 1090.1
46.2 8.78 0 19.0% 0.0% 1090.1
46.2 9.2 0.16 19.9% 0.3% 970.6
Commercial, Industrial, and Community Use
5% 0%
2.7 0.13 0 4.8% 0.0% 1762.3
2.7 0.13 0 4.8% 0.0% 1762.3
2.7 0.9 0 33.3% 0.0% 966.5
Key
The LT Info SW Tools will be used to check the parcel BMP percentages annually for the FF3_UDC BMP Registration. If/when the percentages appear to change, Washoe County will alert TRPA that a follow up BMP Recertification may be beneficial for all parties.
The LT Info SW Tools will be used to check the parcel BMP percentages annually for the FF3_UDC BMP Registration. If/when the percentages appear to change, Washoe County will alert TRPA that a follow up BMP Recertification may be beneficial for all parties.
Other Pollutant Control Strategies

No other pollutant control strategies implemented in this registration