Registration Details
Treatment/Parcel BMPs
Expired

Select a subcatchment on the left to view model input report

C07

: C07ParcelBMPReg
: 782
: 10%
: C07Outfall

Catchment Output Baseline Scenario Value Road Operations Scenario Value Expected Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 27.7 27.7 18.6 9.1 33%
FSP (lbs/yr) 11,408 10,053 7,607 2,446 24%
TP (lbs/yr) 51 48 34 14 29%
TN (lbs/yr) 203 196 138 58 30%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Expected Scenario Value Default Recommended Range
CICU 10.4 10.4 10.4
Erosion Potential 3 2.7 2.7 2.7
Multi Family Residential 27.8 27.8 27.8
Roads 15 15 15
Single Family Residential 31.6 31.6 31.6
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Expected Scenario Value Default Recommended Range
CICU 67.82% 67.82% 67.82% 60%
Erosion Potential 3 0% 0% 0%
Multi Family Residential 47.8% 47.8% 47.8% 50%
Roads 62.88% 62.88% 62.88% 80%
Single Family Residential 28.25% 28.25% 28.25% 40%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Expected Scenario Value Default Recommended Range
Erodible 19.36% 19.36% 19.36%
Protected 3.42% 3.42% 3.42%
Stable 35.55% 35.55% 35.55%
Stable & Protected 41.67% 41.67% 41.67%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Expected Scenario Value Default Recommended Range
2.00 40.68% 5.93% 5.93%
2.30 33.17% 29.21% 29.21%
2.60 26.15% 26.15% 26.15%
3.40 38.71% 38.71%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Expected Scenario Value Default Recommended Range
DCIA 64 64 64 10 - 80%
ICIA 36 36 36
Infiltration Facilities 0 0 0
Pervious Channels 0 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Expected Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.5 0.05 - 1
Shoulders 0.43 0.43 0.43
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Expected Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0 0
Surface Area (sq. ft.) 0 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Expected Scenario Value Default Recommended Range
Average Slope (%) 1 1 1
Length (ft) 0 0 0
Storage Depth (in) 0 0 0
Width (ft) 0 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Expected Scenario Value Default Recommended Range
CIC 5% 5% 43% 5%
MFR 19% 19% 52% 19%
SFR 7% 7% 68% 7%
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Expected Scenario Value Default Recommended Range
CIC 85% 85% 85% 50% 50 - 90%
MFR 65% 65% 65% 50% 30 - 70%
SFR 40% 40% 40% 50% 10 - 50%
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Expected Scenario Value Default Recommended Range
CIC 0.71 0.71 0.71 0.05 - 3
MFR 0.85 0.85 0.85 0.05 - 3
SFR 0.99 0.99 0.99 0.05 - 3
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Expected Scenario Value Default Recommended Range
CIC 1 1 1 1
MFR 1 1 1 1
SFR 1 1 1 1
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Expected Scenario Value Default Recommended Range
CIC 0.5 0.5 0.5 0.5
MFR 0.5 0.5 0.5 0.5
SFR 0.5 0.5 0.5 0.5
There are no Treatment BMPs included in the expected conditions scenario