Registration Details
Road Operations
Approved

Select a subcatchment on the left to view model input report

ED50PM67h

: ED_50_PM67_h
: 667
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 4.4 4.4 0 0%
FSP (lbs/yr) 6,750 3,465 3,285 49%
TP (lbs/yr) 18 11 7 39%
TN (lbs/yr) 52 42 10 19%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 1 0.1 0.1
Erosion Potential 2 0.1 0.1
Roads 3.9 3.9
Unpaved Road 0 0
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 1 0% 0%
Erosion Potential 2 0% 0%
Roads 51.07% 51.07% 80%
Unpaved Road 0% 0%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 100% 100%
Stable 0% 0%
Stable & Protected 0% 0%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 82.55%
1.70 17.45%
2.5 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.4 0.4
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

ED50PM67f

: ED_50_PM67_f
: 628
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 7.6 7.6 0 0%
FSP (lbs/yr) 11,483 5,940 5,543 48%
TP (lbs/yr) 30 20 10 33%
TN (lbs/yr) 89 72 17 19%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0.6 0.6
Erosion Potential 3 4.5 4.5
Erosion Potential 4 0.1 0.1
Roads 6.7 6.7
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Roads 74.7% 74.7% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 100% 100%
Stable 0% 0%
Stable & Protected 0% 0%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 78.5%
1.70 21.46%
2.5 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 60 60 10 - 80%
ICIA 40 40
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.4 0.4
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

ED50PM67e

: ED_50_PM67_e
: 588
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 12.2 12.2 0 0%
FSP (lbs/yr) 16,474 9,433 7,041 43%
TP (lbs/yr) 45 31 14 31%
TN (lbs/yr) 137 114 23 17%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 1.4 1.4
Erosion Potential 3 12 12
Roads 14.5 14.5
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Roads 71.36% 71.36% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 19.22% 19.22%
Protected 63.12% 63.12%
Stable 0% 0%
Stable & Protected 17.66% 17.66%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 29.87%
1.70 70.13%
2.5 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 36 36 10 - 80%
ICIA 64 64
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.4 0.4
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

Pla28PM1d

: Pla_28_PM1_d
: 276
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 3.6 3.6 0 0%
FSP (lbs/yr) 5,488 2,939 2,549 46%
TP (lbs/yr) 14 10 4 29%
TN (lbs/yr) 42 34 8 19%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0.1 0.1
Erosion Potential 4 0 0
Roads 3 3
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Roads 55.8% 55.8% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 31.67% 31.67%
Protected 53.18% 53.18%
Stable 0% 0%
Stable & Protected 15.15% 15.15%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 74.07%
1.70 25.93%
2.5 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.2 0.2
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

Pla28PM1c

: Pla_28_PM1_c
: 240
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 3.4 3.4 0 0%
FSP (lbs/yr) 4,424 2,467 1,957 44%
TP (lbs/yr) 12 8 4 33%
TN (lbs/yr) 38 32 6 16%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0.3 0.3
Erosion Potential 4 0 0
Roads 3 3
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Roads 54.74% 54.74% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 81.88% 81.88%
Stable 0% 0%
Stable & Protected 18.12% 18.12%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 28.01%
1.70 71.99%
2.5 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.3 0.3
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

Pla89PM0a

: Pla_89_PM0_a
: 201
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 5.7 5.7 0 0%
FSP (lbs/yr) 6,938 4,871 2,067 30%
TP (lbs/yr) 20 15 5 25%
TN (lbs/yr) 61 54 7 11%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0 0
Erosion Potential 3 3.2 3.2
Roads 8.9 8.9
Unpaved Road 0.1 0.1
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Roads 36.03% 36.03% 80%
Unpaved Road 0% 0%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 40.05% 40.05%
Protected 53.88% 53.88%
Stable 0% 0%
Stable & Protected 6.06% 6.06%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.70 42.61%
2.00 57.39%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 84 84 10 - 80%
ICIA 16 16
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.4 0.43
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

Pla89PM1b

: Pla_89_PM1_b
: 174
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 6.9 6.8 0.1 1%
FSP (lbs/yr) 8,230 5,620 2,610 32%
TP (lbs/yr) 24 18 6 25%
TN (lbs/yr) 74 65 9 12%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0.5 0.5
Roads 6.6 6.6
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Roads 56.09% 56.09% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 28.02% 28.02%
Protected 62.11% 62.11%
Stable 0% 0%
Stable & Protected 9.87% 9.87%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.70 49.32%
2.00 50.68%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 89 89 10 - 80%
ICIA 11 11
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.4 0.43
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

Pla89PM1c

: Pla_89_PM1_c
: 146
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 11.8 11.8 0 0%
FSP (lbs/yr) 14,881 10,778 4,103 28%
TP (lbs/yr) 42 34 8 19%
TN (lbs/yr) 129 114 15 12%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0.1 0.1
Erosion Potential 4 0 0
Roads 8.7 8.7
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Roads 70.48% 70.48% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 70.5% 70.5%
Protected 9.93% 9.93%
Stable 0% 0%
Stable & Protected 19.57% 19.57%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.70 34.5%
2.00 65.5%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 88 88 10 - 80%
ICIA 12 12
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.43 0.43
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

Pla89PM1d

: Pla_89_PM1_d
: 148
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 10.9 10.9 0 0%
FSP (lbs/yr) 12,868 8,400 4,468 35%
TP (lbs/yr) 37 28 9 24%
TN (lbs/yr) 118 102 16 14%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0.6 0.6
Erosion Potential 4 0 0
Roads 9.5 9.5
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Roads 59% 59% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 21.31% 21.31%
Protected 55.67% 55.67%
Stable 0% 0%
Stable & Protected 23.02% 23.02%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.70 63.24%
2.00 36.76%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 84 84 10 - 80%
ICIA 16 16
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.43 0.4
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

Pla89PM1e

: Pla_89_PM1_e
: 149
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 5 5 0 0%
FSP (lbs/yr) 7,338 4,832 2,506 34%
TP (lbs/yr) 20 15 5 25%
TN (lbs/yr) 58 50 8 14%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0.2 0.2
Erosion Potential 4 0.4 0.4
Roads 3.9 3.9
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Roads 58.37% 58.37% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 71.72% 71.72%
Protected 22.6% 22.6%
Stable 0% 0%
Stable & Protected 5.68% 5.68%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.70 100%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.43 0.4
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

Pla89PM1f

: Pla_89_PM1_f
: 151
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 13.1 13.1 0 0%
FSP (lbs/yr) 17,243 12,467 4,776 28%
TP (lbs/yr) 48 38 10 21%
TN (lbs/yr) 145 129 16 11%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0.4 0.4
Erosion Potential 3 3 3
Erosion Potential 4 0.1 0.1
Roads 11.9 11.9
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Roads 55.96% 55.96% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 69.25% 69.25%
Protected 26.65% 26.65%
Stable 0% 0%
Stable & Protected 4.09% 4.09%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.70 42.71%
2.00 57.29%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 88 88 10 - 80%
ICIA 12 12
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.43 0.4
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

Pla89PM1g

: Pla_89_PM1_g
: 176
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 9.1 9.1 0 0%
FSP (lbs/yr) 13,001 7,006 5,995 46%
TP (lbs/yr) 35 23 12 34%
TN (lbs/yr) 104 86 18 17%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0.3 0.3
Roads 8.1 8.1
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Roads 56.66% 56.66% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 5.55% 5.55%
Protected 86.3% 86.3%
Stable 0% 0%
Stable & Protected 8.15% 8.15%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 75.38%
2.00 24.62%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 93 93 10 - 80%
ICIA 7 7
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.43 0.4
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

Pla89PM1h

: Pla_89_PM1_h
: 202
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 5.4 5.4 0 0%
FSP (lbs/yr) 8,704 4,552 4,152 48%
TP (lbs/yr) 22 15 7 32%
TN (lbs/yr) 64 51 13 20%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0.6 0.6
Roads 8.3 8.3
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Roads 63.4% 63.4% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 32.89% 32.89%
Protected 62.62% 62.62%
Stable 0% 0%
Stable & Protected 4.49% 4.49%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.5 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 49 49 10 - 80%
ICIA 51 51
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.43 0.4
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

Pla89PM1i

: PLa_89_PM1_i
: 203
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 5.1 5.1 0 0%
FSP (lbs/yr) 7,155 4,082 3,073 43%
TP (lbs/yr) 19 13 6 32%
TN (lbs/yr) 58 48 10 17%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0 0
Erosion Potential 3 0.2 0.2
Roads 6 6
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Roads 64.11% 64.11% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 36.45% 36.45%
Protected 35.82% 35.82%
Stable 0% 0%
Stable & Protected 27.73% 27.73%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 36.6%
1.70 63.4%
2.5 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 63 63 10 - 80%
ICIA 37 37
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.4 0.4
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

Pla28PM1n

: Pla_28_PM1_n
: 401
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 5.9 5.9 0 0%
FSP (lbs/yr) 6,525 3,032 3,493 54%
TP (lbs/yr) 19 12 7 37%
TN (lbs/yr) 63 52 11 17%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0 0
Erosion Potential 3 0.1 0.1
Roads 3.8 3.8
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Roads 77.19% 77.19% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 0.19% 0.19%
Stable 0% 0%
Stable & Protected 99.81% 99.81%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 31.2%
1.70 68.8%
2.5 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.4 0.4
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

Pla28PM1b

: Pla_28_PM1_b
: 239
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 1.5 1.5 0 0%
FSP (lbs/yr) 2,213 995 1,218 55%
TP (lbs/yr) 6 4 2 33%
TN (lbs/yr) 18 14 4 22%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0 0
Erosion Potential 3 0.4 0.4
Erosion Potential 4 0 0
Roads 1.5 1.5
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Roads 49.43% 49.43% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 49.94% 49.94%
Stable 0% 0%
Stable & Protected 50.06% 50.06%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.5 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.43 0.4
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

Pla28PM1m

: Pla_28_PM1_m
: 401
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 2.8 2.8 0 0%
FSP (lbs/yr) 3,205 1,400 1,805 56%
TP (lbs/yr) 9 6 3 33%
TN (lbs/yr) 29 24 5 17%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0.1 0.1
Erosion Potential 3 0.5 0.5
Roads 3 3
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Roads 55.37% 55.37% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 0% 0%
Stable 0% 0%
Stable & Protected 100% 100%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 54.86%
1.70 45.14%
2.5 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 82 82 10 - 80%
ICIA 18 18
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.4 0.4
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

Pla28PM9c

: Pla_28_PM9_c
: 600
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 3.1 3.1 0 0%
FSP (lbs/yr) 3,530 1,989 1,541 44%
TP (lbs/yr) 10 7 3 30%
TN (lbs/yr) 33 28 5 15%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0.2 0.2
Erosion Potential 3 0 0
Erosion Potential 4 0.1 0.1
Roads 3.8 3.8
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Roads 69.01% 69.01% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 48.99% 48.99%
Stable 0% 0%
Stable & Protected 51.01% 51.01%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.70 100%
2.5 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 75 75 10 - 80%
ICIA 25 25
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.4 0.4
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

Pla28PM9b

: Pla_28_PM9_b
: 532
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 15.5 15.5 0 0%
FSP (lbs/yr) 18,121 7,971 10,150 56%
TP (lbs/yr) 52 32 20 38%
TN (lbs/yr) 167 135 32 19%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0 0
Erosion Potential 4 1.5 1.5
Roads 10.1 10.1
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Roads 86.54% 86.54% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 1.18% 1.18%
Stable 0% 0%
Stable & Protected 98.82% 98.82%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 53.62%
1.70 46.38%
2.5 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 98 98 10 - 80%
ICIA 2 2
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.2 0.2
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

Pla28PM9a

: Pla_28_PM9_a
: 532
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 3.4 3.4 0 0%
FSP (lbs/yr) 4,491 1,763 2,728 61%
TP (lbs/yr) 12 7 5 42%
TN (lbs/yr) 38 30 8 21%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Roads 2 2
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Roads 95.48% 95.48% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 0% 0%
Stable 0% 0%
Stable & Protected 100% 100%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.5 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.2 0.2
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

Pla28PM1x

: Pla_28_PM1_x
: 502
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 5.9 5.9 0 0%
FSP (lbs/yr) 8,336 3,656 4,680 56%
TP (lbs/yr) 22 13 9 41%
TN (lbs/yr) 67 53 14 21%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 4 0 0
Roads 3.4 3.4
Vegetated Turf 0 0
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 4 0% 0%
Roads 92.07% 92.07% 80%
Vegetated Turf 0% 0%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 18.3% 18.3%
Protected 3.09% 3.09%
Stable 0% 0%
Stable & Protected 78.61% 78.61%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.5 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
VGT 0.32 0.32 0.05 - 3
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

Pla28PM1w

: Pla_28_PM1_w
: 502
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 5.8 5.8 0 0%
FSP (lbs/yr) 8,791 4,661 4,130 47%
TP (lbs/yr) 23 15 8 35%
TN (lbs/yr) 68 55 13 19%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 4 0 0
Roads 3.5 3.5
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 4 0% 0%
Roads 89.72% 89.72% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 35.97% 35.97%
Protected 35.55% 35.55%
Stable 0% 0%
Stable & Protected 28.48% 28.48%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 72.1%
1.70 27.9%
2.5 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.3 0.3
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

Pla28PM1v

: Pla_28_PM1_v
: 481
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 3.2 3.2 0 0%
FSP (lbs/yr) 4,265 1,901 2,364 55%
TP (lbs/yr) 12 7 5 42%
TN (lbs/yr) 36 28 8 22%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0 0
Erosion Potential 4 0.6 0.6
Roads 2.1 2.1
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Roads 80.43% 80.43% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 32.53% 32.53%
Stable 0% 0%
Stable & Protected 67.47% 67.47%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 84.17%
1.70 15.83%
2.5 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.3 0.3
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

Pla28PM1u

: Pla_28_PM1_u
: 481
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 5.9 5.9 0 0%
FSP (lbs/yr) 6,551 3,040 3,511 54%
TP (lbs/yr) 19 12 7 37%
TN (lbs/yr) 63 52 11 17%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0 0
Erosion Potential 4 0 0
Roads 3.6 3.6
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Roads 87.98% 87.98% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 0% 0%
Stable 0% 0%
Stable & Protected 100% 100%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 31.53%
1.70 68.47%
2.5 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.3 0.3
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

Pla28PM1t

: Pla_28_PM1_t
: 462
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 5 5 0 0%
FSP (lbs/yr) 5,544 3,038 2,506 45%
TP (lbs/yr) 16 11 5 31%
TN (lbs/yr) 54 45 9 17%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Roads 2.8 2.8
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Roads 87.68% 87.68% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 34.43% 34.43%
Stable 0% 0%
Stable & Protected 65.57% 65.57%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.70 100%
2.5 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

Pla28PM1s

: Pla_28_PM1_s
: 462
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 3.2 3.2 0 0%
FSP (lbs/yr) 4,126 2,131 1,995 48%
TP (lbs/yr) 12 8 4 33%
TN (lbs/yr) 36 30 6 17%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0 0
Erosion Potential 3 0 0
Roads 2 2
Unpaved Road 0 0
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Roads 78.64% 78.64% 80%
Unpaved Road 0% 0%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 53.02% 53.02%
Stable 0% 0%
Stable & Protected 46.98% 46.98%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 39.06%
1.70 60.94%
2.5 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

Pla28PM1a

: Pla_28_PM1_a
: 239
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 3.9 3.9 0 0%
FSP (lbs/yr) 4,643 2,635 2,008 43%
TP (lbs/yr) 13 9 4 31%
TN (lbs/yr) 42 36 6 14%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0 0
Erosion Potential 3 0.2 0.2
Erosion Potential 4 0.5 0.5
Roads 2.1 2.1
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Roads 88.76% 88.76% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 61.78% 61.78%
Stable 0% 0%
Stable & Protected 38.22% 38.22%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 6.32%
1.70 93.68%
2.5 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.4 0.4
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

Pla28PM1r

: Pla_28_PM1_r
: 443
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 3.6 3.6 0 0%
FSP (lbs/yr) 5,123 2,312 2,811 55%
TP (lbs/yr) 14 8 6 43%
TN (lbs/yr) 41 32 9 22%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 1 0 0
Erosion Potential 2 0.3 0.3
Erosion Potential 3 0.1 0.1
Roads 2.6 2.6
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 1 0% 0%
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Roads 65.58% 65.58% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 51.94% 51.94%
Stable 0% 0%
Stable & Protected 48.06% 48.06%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.5 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.3 0.3
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

Pla28PM1q

: Pla_28_PM1_q
: 423
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 8.5 8.5 0 0%
FSP (lbs/yr) 11,396 4,963 6,433 56%
TP (lbs/yr) 31 19 12 39%
TN (lbs/yr) 96 76 20 21%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 1 0.1 0.1
Erosion Potential 2 0.3 0.3
Erosion Potential 3 0.3 0.3
Roads 5.3 5.3
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 1 0% 0%
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Roads 79.62% 79.62% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 26.02% 26.02%
Stable 0% 0%
Stable & Protected 73.98% 73.98%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 87.14%
1.70 12.86%
2.5 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.2 0.2
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

Pla28PM1p2

: Pla_28_PM1_p
: 423
: 5%
: Outfall1

There was an error parsing the PLRM files to create a model input report for this subcatchment

Pla28PM1o

: Pla_28_PM1_o
: 146
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 1.7 1.7 0 0%
FSP (lbs/yr) 1,985 1,121 864 44%
TP (lbs/yr) 6 4 2 33%
TN (lbs/yr) 19 16 3 16%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0 0
Roads 1.3 1.3
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Roads 60.91% 60.91% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 50.09% 50.09%
Stable 0% 0%
Stable & Protected 49.91% 49.91%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.70 100%
2.5 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.3 0.3
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

Pla28PM1l

: Pla_28_PM1_l
: 146
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 5 5 0 0%
FSP (lbs/yr) 6,242 2,529 3,713 59%
TP (lbs/yr) 17 10 7 41%
TN (lbs/yr) 54 43 11 20%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0.3 0.3
Erosion Potential 3 0.9 0.9
Roads 4.8 4.8
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Roads 47.49% 47.49% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 0% 0%
Stable 0% 0%
Stable & Protected 100% 100%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 85.64%
1.70 14.36%
2.5 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.38 0.4
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

Pla28PM1k

: Pla_28_PM1_k
: 374
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 5.5 5.5 0 0%
FSP (lbs/yr) 7,353 3,545 3,808 52%
TP (lbs/yr) 20 13 7 35%
TN (lbs/yr) 62 50 12 19%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0.1 0.1
Erosion Potential 3 0.4 0.4
Erosion Potential 4 0.2 0.2
Roads 5 5
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Roads 53.53% 53.53% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 49.27% 49.27%
Stable 0% 0%
Stable & Protected 50.73% 50.73%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 65.99%
1.70 34.01%
2.5 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.4 0.4
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

Pla28PM1j

: Pla_28_PM1_j
: 373
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 4.1 4.1 0 0%
FSP (lbs/yr) 4,829 2,223 2,606 54%
TP (lbs/yr) 14 9 5 36%
TN (lbs/yr) 44 36 8 18%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0.1 0.1
Erosion Potential 4 0.1 0.1
Roads 3.4 3.4
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Roads 59.2% 59.2% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 5.27% 5.27%
Protected 0% 0%
Stable 0% 0%
Stable & Protected 94.73% 94.73%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 46%
1.70 54%
2.5 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.4 0.4
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

Pla28PM1i

: Pla_28_PM1_i
: 373
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 4.1 4.1 0 0%
FSP (lbs/yr) 4,697 2,100 2,597 55%
TP (lbs/yr) 13 8 5 38%
TN (lbs/yr) 44 36 8 18%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0.1 0.1
Erosion Potential 4 0.1 0.1
Roads 3.3 3.3
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Roads 60.63% 60.63% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 0% 0%
Stable 0% 0%
Stable & Protected 100% 100%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 45.86%
1.70 54.14%
2.5 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.3 0.3
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

Pla28PM1h

: Pla_28_PM1_h
: 372
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 6.4 6.4 0 0%
FSP (lbs/yr) 8,033 3,265 4,768 59%
TP (lbs/yr) 22 13 9 41%
TN (lbs/yr) 70 56 14 20%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0.7 0.7
Erosion Potential 4 2.8 2.8
Erosion Potential 5 0 0
Roads 4.2 4.2
Unpaved Road 0.1 0.1
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Erosion Potential 5 0% 0%
Roads 73.71% 73.71% 80%
Unpaved Road 0% 0%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 0% 0%
Stable 0% 0%
Stable & Protected 100% 100%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 84.83%
1.70 15.17%
2.5 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.3 0.3
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

Pla28PM1g

: Pla_28_PM1_g
: 343
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 2.2 2.2 0 0%
FSP (lbs/yr) 2,485 1,331 1,154 46%
TP (lbs/yr) 7 5 2 29%
TN (lbs/yr) 23 19 4 17%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0.6 0.6
Erosion Potential 4 0.7 0.7
Roads 1.5 1.5
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Roads 68.42% 68.42% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 39.22% 39.22%
Stable 0% 0%
Stable & Protected 60.78% 60.78%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 12.43%
1.70 87.57%
2.5 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 98 98 10 - 80%
ICIA 2 2
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.3 0.3
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

Pla28PM0b

: Pla_28_PM0_b
: 239
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 3 3 0 0%
FSP (lbs/yr) 3,836 2,047 1,789 47%
TP (lbs/yr) 11 7 4 36%
TN (lbs/yr) 34 28 6 18%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0.4 0.4
Erosion Potential 4 0 0
Roads 1.8 1.8
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Roads 80.51% 80.51% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 59.5% 59.5%
Stable 0% 0%
Stable & Protected 40.5% 40.5%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 30.22%
1.70 69.78%
2.5 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.2 0.2
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

Pla28PM1e

: Pla_28_PM1_e
: 313
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 13.1 13.1 0 0%
FSP (lbs/yr) 16,961 8,889 8,072 48%
TP (lbs/yr) 47 31 16 34%
TN (lbs/yr) 146 121 25 17%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0.3 0.3
Erosion Potential 4 0.7 0.7
Roads 10 10
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Roads 62.7% 62.7% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 61.88% 61.88%
Stable 0% 0%
Stable & Protected 38.12% 38.12%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 40.1%
1.70 59.9%
2.5 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.3 0.3
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

ED50PM79a

: ED_50_PM79_a
: 847
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 12.1 12.1 0 0%
FSP (lbs/yr) 16,673 7,047 9,626 58%
TP (lbs/yr) 45 27 18 40%
TN (lbs/yr) 138 109 29 21%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0 0
Roads 11.9 11.9
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Roads 90.48% 90.48% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 0% 0%
Stable 50.49% 50.49%
Stable & Protected 49.51% 49.51%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.5 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.3 0.3
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

ED50PM77a

: ED_50_PM77_a
: 781
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 18.6 18.6 0 0%
FSP (lbs/yr) 26,244 11,507 14,737 56%
TP (lbs/yr) 70 42 28 40%
TN (lbs/yr) 213 169 44 21%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Roads 17.2 17.2
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Roads 87.1% 87.1% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 8.68% 8.68%
Protected 0% 0%
Stable 44.42% 44.42%
Stable & Protected 46.9% 46.9%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.5 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.4 0.4
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

ED50PM75a

: ED_50_PM75_a
: 710
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 29.6 29.6 0 0%
FSP (lbs/yr) 39,073 15,498 23,575 60%
TP (lbs/yr) 106 62 44 42%
TN (lbs/yr) 331 260 71 21%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Roads 19.1 19.1
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Roads 92.14% 92.14% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 1.63% 1.63%
Protected 0% 0%
Stable 0% 0%
Stable & Protected 98.37% 98.37%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.5 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.4 0.4
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

ED50PM73c

: ED_50_PM73_c
: 672
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 12 12 0 0%
FSP (lbs/yr) 15,978 6,392 9,586 60%
TP (lbs/yr) 43 25 18 42%
TN (lbs/yr) 135 106 29 21%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0 0
Roads 7.2 7.2
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Roads 90.96% 90.96% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 1.13% 1.13%
Protected 0% 0%
Stable 7.54% 7.54%
Stable & Protected 91.33% 91.33%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.5 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.3 0.3
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

ED50PM73b

: ED_50_PM73_b
: 671
: 5%
: InfiltrationBasin1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 7.2 7.2 0 0%
FSP (lbs/yr) 9,734 4,053 5,681 58%
TP (lbs/yr) 26 15 11 42%
TN (lbs/yr) 81 64 17 21%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 4.1 4.1
Erosion Potential 4 1.9 1.9
Roads 5.8 5.8
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Roads 64.54% 64.54% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 3.43% 3.43%
Protected 12.89% 12.89%
Stable 0% 0%
Stable & Protected 83.68% 83.68%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.5 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.4 0.4
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

ED50PM73a

: ED_50_PM73_a
: 669
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 10 10 0 0%
FSP (lbs/yr) 14,861 6,944 7,917 53%
TP (lbs/yr) 39 24 15 38%
TN (lbs/yr) 116 93 23 20%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 1 1.1 1.1
Erosion Potential 2 3.5 3.5
Erosion Potential 3 6 6
Erosion Potential 4 0.8 0.8
Roads 8.7 8.7
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 1 0% 0%
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Roads 64.24% 64.24% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 3.11% 3.11%
Protected 61.22% 61.22%
Stable 0% 0%
Stable & Protected 35.67% 35.67%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.5 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 85 85 10 - 80%
ICIA 15 15
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.41 0.4
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

ED50PM72a

: ED_50_PM72_a
: 668
: 5%
: InfiltrationBasin1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 8.7 8.7 0 0%
FSP (lbs/yr) 9,614 4,524 5,090 53%
TP (lbs/yr) 28 18 10 36%
TN (lbs/yr) 92 76 16 17%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 1 8.4 8.4
Erosion Potential 2 1.9 1.9
Roads 6.8 6.8
Unpaved Road 0 0
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 1 0% 0%
Erosion Potential 2 0% 0%
Roads 64.04% 64.04% 80%
Unpaved Road 0% 0%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 3.82% 3.82%
Stable 0% 0%
Stable & Protected 96.18% 96.18%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 30.36%
1.70 69.64%
2.5 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 92 92 10 - 80%
ICIA 8 8
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.4 0.4
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

ED50PM67g

: ED_50_PM67_g
: 628
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 3.7 3.7 0 0%
FSP (lbs/yr) 4,724 2,883 1,841 39%
TP (lbs/yr) 13 10 3 23%
TN (lbs/yr) 41 35 6 15%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0.3 0.3
Erosion Potential 3 3.5 3.5
Roads 3.6 3.6
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Roads 45.96% 45.96% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 100% 100%
Stable 0% 0%
Stable & Protected 0% 0%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.70 100%
2.5 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 94 94 10 - 80%
ICIA 6 6
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.4 0.4
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

Pla28PM0a

: Pla_28_PM0_a
: 205
: 5%
: Pla_1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 3.6 3.6 0 0%
FSP (lbs/yr) 4,695 1,842 2,853 61%
TP (lbs/yr) 13 7 6 46%
TN (lbs/yr) 40 31 9 23%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 4 0 0
Roads 1.8 1.8
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 4 0% 0%
Roads 96.35% 96.35% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 0% 0%
Stable 0% 0%
Stable & Protected 100% 100%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.5 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.19 0.2
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

Select a Treatment BMP on the left to view model input report

InfiltrationBasin1

: ED_50_PM73_b
: ED50PM73b, ED50PM72a
: 0

Infiltration Basin Parameters
Design Parameters Baseline Scenario Value Road Operations Scenario Value Default Lower Value Upper Value
Footprint (sq ft) 5,290 5,290 1,000
Infiltration Rate (in/hr) 0.4 0.4 0.4 0.05 1.5
Water Quality Volume (cu ft) 21,159 21,159 2,500
Characteristic Effluent Concentrations
Pollutant (mg/L) Baseline Scenario Value Road Operations Scenario Value Default Lower Value Mid Value Upper Value
CECs not applicable

InfiltrationBasin1

: ED_50_PM72_a
: ED50PM73b, ED50PM72a
: 0

Infiltration Basin Parameters
Design Parameters Baseline Scenario Value Road Operations Scenario Value Default Lower Value Upper Value
Footprint (sq ft) 5,290 5,290 1,000
Infiltration Rate (in/hr) 0.4 0.4 0.4 0.05 1.5
Water Quality Volume (cu ft) 21,159 21,159 2,500
Characteristic Effluent Concentrations
Pollutant (mg/L) Baseline Scenario Value Road Operations Scenario Value Default Lower Value Mid Value Upper Value
CECs not applicable

Pla_1

: Pla_28_PM0_a
: Pla28PM0a
: 0

Treatment Vault Parameters
Design Parameters Baseline Scenario Value Road Operations Scenario Value Default Lower Value Upper Value
Maximum Treatment Flow (cfs) 0.32 0.32 0
Characteristic Effluent Concentrations
Pollutant (mg/L) Baseline Scenario Value Road Operations Scenario Value Default Lower Value Mid Value Upper Value
TSS 171 171
FSP 55.8 55.8
TN 2 2
DIN 0.6 0.6
TP 1.97 1.97
SRP 0.06 0.06