Basics
WCIF0100to106
11/24/2019
Infiltration Basin
5
1
series of 7 inline, sloped perf pipes with a manhole upstream and 4 DIs along Incline Way, installed 9/15/2017 with EastIV PhI WQIP, catchment WC20A2. BMP type was updated and previous version archived 11/22/2019. BMP Type updated 1/6/2020. Combined DI sump 4ft, 30% accum material set as Theshold (1.2ft).

Benchmark & Threshold Values
Observation Type Benchmark Threshold
Material Accumulation using Stadia Rod 0 ft 1.2 ft
Photos

No photos available.

Location
Assessments

This is a comprehensive list of all assessments conducted on this Treatment BMP, including assessments for the current version and the archived version(s).

Currently viewing of Download Table
Documents

No documents have been uploaded for this Treatment BMP