Overview
Rocky Point 1&2 Rereg
BMP Registration
Approved

10/01/2025 to 09/30/2035 (10 years)
58 credits
58 credits (100%)

Yes
No
No

Registration Area & BMPs
Declarations
Credit Schedule
10/1/2025
10 years
09/30/2035
This is a re-registration of Rocky Point 1 & 2 for another 10 year term (2026-2035). Though the project was completed in 2005 and the lifespan of project improvements is assumed to be 20 years, BMP RAM scores indicate that the six basins in this project area are still functioning well. Additionally, the City is committed to continuing maintenance of all the basins as needed to maintain the current level of performance.

100%
58
58
PLRM Models and Load Reduction
RockyPoint_1_2 (Project3)
ExpectedConditions_Divider_Change_UPDATED2018 (Scenario6) Expected Scenario 100%
Baseline_UPDATED2018 (Scenario7) Baseline Scenario 100%
ExpectedRoads_UPDATED2018 (Scenario8) Road Operations Scenario 100%

23,135 86 333 N/A
17,473 72 308 N/A
5,867 29 153 N/A
Load Reduction 11,606 43 155 58
Treatment BMPs
Yes

Dry Basin Fern Basin 4,597 21 81 23 Essential No
Dry Basin LowerPark2B 3,117 14 56 16 Essential Yes
Dry Basin Rocky Point Basin 1,255 5 16 6 Key No
Wet Basin Shepards RP 1-2 707 2 6 4 Key No
Infiltration Basin LowerPark2A 132 1 5 1 Supporting Yes
Wet Basin UpperPark -767 -4 -9 0 Supporting Yes
Total 50

No distributed BMPs added to registration

The City plans to maintain treatment BMPs within based on BMP RAM and NPDES inspections. Essential and Key BMPs and will be maintained by the City Street Maintenance crew on an As-Needed basis. Maintenance will be performed by backhoe and/or hand crew to remove excess sediment from the basin. The Vaults will be Vactored on an As-Needed basis dependent on NPDES and BMP RAM Inspections. Emphasis will be placed on restoring the soil in the basins to an infiltration rate consistent with the BMP RAM benchmark value.
The City inspects all treatment BMPs in accordance with the BMP RAM. Additional inspections may be performed if required by NPDES permits, or to assess performance or maintenance needs. Inspections take place beginning in spring and will continue through the fall. Essential and Key BMPs are inspected according to the BMP RAM and NPDES permit. Engineering staff use the Constant Head Permeameter (CHP) to determine the infiltration rate of the basin. Staff Gauges are utilized to determine the amount of sediment in the vaults. Staff perform a visual inspection and record results with a handheld GPS unit or field tablet. Inspections of all Basins take place in the late spring or early summer.
Parcel BMPs
No
Single Family Residential
7% 0%
35.7 2.5 0 7.0% 0.0% 109.6
35.7 2.5 0 7.0% 0.0% 109.6
35.7 2.5 0 7.0% 0.0% 193.9
Multi-Family Residential
19% 0%
21.6 4.1 0 19.0% 0.0% 1678.9
21.6 4.1 0 19.0% 0.0% 1678.9
21.6 4.1 0 19.0% 0.0% 1448.1
Commercial, Industrial, and Community Use
5% 0%
54.3 2.71 0 5.0% 0.0% 21931.9
54.3 2.72 0 5.0% 0.0% 21931.9
54.3 2.72 0 5.0% 0.0% 21387.2
Other Pollutant Control Strategies

No other pollutant control strategies implemented in this registration