Basics
UpperPark
11/22/2019
Wet Basin
1
1
2.76 ft
Stage added to bypass standpipe to ensure flows (2 cfs) directed to LowerPark2A and LowerPark2B. System generated note: BMP assessment type was updated and previous version of the BMP was archived on 11/22/2019.

Benchmark & Threshold Values
Observation Type Benchmark Threshold
Material Accumulation - -
Wetland and Riparian Vegetative Cover - -
Photos

No photos available.

Location
Assessments

This is a comprehensive list of all assessments conducted on this Treatment BMP, including assessments for the current version and the archived version(s).

Currently viewing of Download Table
Documents

No documents have been uploaded for this Treatment BMP