Overview
Central Incline Village Phase I WQIP
BMP Registration
Approved

10/01/2016 to 09/30/2031 (15 years)
36 credits
36 credits (100%)

Yes
Yes
No

Registration Area & BMPs
Declarations
Currently viewing of Registration Years Reset  Download Table
Credit Schedule
10/1/2016
15 years
09/30/2031
This registration includes post-2004 treatment BMPs from one WQIP, and the installation of new stormwater improvements within this catchment during the next 15 years is unlikely. All improvements were in place prior to WY2016, and the establishment date of 10/01/2016 indicates the first year of the credit schedule is WY2017. The 15 year credit schedule starting in WY2017 is reasonable.

100%
36
36
PLRM Models and Load Reduction
CIVph1_ThirdCrk (Project64)
Baseline (Scenario1) Baseline Scenario 80%
RdOps34 (Scenario2) Road Operations Scenario 80%
BMP (Scenario4) Expected Scenario 80%
CIVph1_noThirdCrk (Project69)
RdOps34 (Scenario1) Road Operations Scenario 100%
Baseline (Scenario2) Baseline Scenario 100%
BMP (Scenario7) Expected Scenario 100%

18,254.4 74.2 291 N/A
16,908.4 72.2 297 N/A
9,649.2 42.4 173.4 N/A
Load Reduction 7,259.2 29.8 123.6 36
Treatment BMPs
Yes

Infiltration Basin WCIF0015n34 1,172 4 18 6 Key No
Infiltration Basin WCIF0016 1,148 4 16 6 Key No
Infiltration Basin WCIF0035to50 912 4 20 5 Key No
Infiltration Basin WCIF0017to28 810 3 11 4 Key No
Dry Basin WCCD2005 315 1 5 2 Supporting No
Infiltration Basin WCIF0029to33 322 1 5 2 Supporting No
Infiltration Basin WCIF0014 432 2 7 2 Supporting No
Total 27

Infiltration Feature WCIF0065 Supporting Load reduction potential is 216 lbs/yr FSP No
Infiltration Feature WCIF0061 Supporting Load reduction potential is 99 lbs/yr FSP No
Infiltration Feature WCIF0058 Supporting Load reduction potential is 105 lbs/yr FSP No
Infiltration Feature WCIF0056n57 Supporting Load reduction potential is 234 lbs/yr FSP No
Infiltration Feature WdTrib1BPvCH Supporting A series of pervious channels throughout catchment WdTrib1B installed prior to 2004 that provides treatment at a low funcitoning capacity was augmented in 2014 with the addition of WCCD2002, on short pervious channel segment installed on Carano Ct. This new channel segment (WCCD2002) was added to WdTrib1BPvCh at a minimal functioning capacity which provides a small load reduction (31lbs/yr FSP, Table 6). No

Washoe County plans to inspect all key and essential treatment BMPs in accordance with the protocols described in the BMP RAM User Manual V2 (2ndNature, 2015). These inspections are used to assess condition/performance and initiate maintenance. See the attached Treatment BMP Maintenance & Inspection Frequency Summary.
Inspection of all stormwater infrastructure assets occurs annually during the spring, summer or fall. Additional inspections may occur after major precipitation events. See attached Treatment BMP Maintenance & Inspection Frequency Summary and BMP RAM for CIVph1 Underground Infiltration Facilities_20180914 documents.
Parcel BMPs
Yes
Single Family Residential
7% 0%
106.1 7.43 0 7.0% 0.0% n/a
106.1 7.43 0 7.0% 0.0% n/a
106.1 67.26 7.35 63.4% 6.9% n/a
Multi-Family Residential
19% 0%
38.2 7.26 0 19.0% 0.0% n/a
49.4 9.39 0 19.0% 0.0% n/a
49.4 23.86 0.03 48.3% 0.1% n/a
Commercial, Industrial, and Community Use
5% 0%
7.1 0.36 0 5.1% 0.0% n/a
5.5 0.28 0 5.1% 0.0% n/a
5.5 2.1 0 38.2% 0.0% n/a
Key
The LT Info SW Tools will be used to check the parcel BMP percentages annually for the CIVph1 BMP Registration. If/when the percentages appear to change, Washoe County will alert TRPA that a follow up BMP Recertification may be beneficial for all parties.
The LT Info SW Tools will be used to check the parcel BMP percentages annually for the CIVph1 BMP Registration. If/when the percentages appear to change, Washoe County will alert TRPA that a follow up BMP Recertification may be beneficial for all parties.
No statistics PDF generated
Other Pollutant Control Strategies

No other pollutant control strategies implemented in this registration