Overview
Central Incline Village Phase II BMP Registration
BMP Registration
Approved

10/01/2017 to 09/30/2032 (15 years)
12 credits
12 credits (100%)

Yes
Yes
No

Registration Area & BMPs
Declarations
Currently viewing of Registration Years Download Table
Credit Schedule
10/1/2017
15 years
09/30/2032
This registration includes post-2004 treatment BMPs from the Centrail Incline Village Phase II WQIP, and the installation of new stormwater improvements within this catchment during the next 15 years is unlikely. All improvements were in place prior to WY2017, and the establishment date of 10/01/2017 indicates the first year of the credit schedule was WY2018. The 15 year credit schedule starting in WY2018 is reasonable.

100%
12
12
PLRM Models and Load Reduction
CIVph2BMPReg (Project57)
Baseline (Scenario1) Baseline Scenario 100%
RdOps (Scenario2) Road Operations Scenario 100%
BMP (Scenario4) Expected Scenario 100%

7,277 35 139 N/A
5,801 31 133 N/A
3,390 19 84 N/A
Load Reduction 2,411 12 49 12
Treatment BMPs
Yes

Infiltration Basin WCIF0088n89 305 1 4 2 Supporting No
Infiltration Basin WCIF0066to68 184 1 2 1 Supporting No
Infiltration Basin WCIF0070n71 97 0 2 0 Supporting No
Total 3

No distributed BMPs added to registration

It is the responsibility of Washoe County to monitor and maintain all drainage improvements and treatment BMPs. Washoe County will maintain treatment BMPs that fail annual assessments to standards identified in the TRPA BMP Handbook. Annual assessments are used to assess condition/performance and initiate maintenance on an annual basis. Washoe County will use a vactor truck, excavator, hand crew or other methods necessary to maintain treatment BMPs at or better than expected conditions.
Washoe County plans to inspect all key and essential treatment BMPs in accordance with the protocols described in the BMP RAM User Manual V2 (2ndNature, 2015). These inspections are used to assess condition/performance and initiate maintenance on an annual basis. Additional inspections may occur after major precipitation events.
Parcel BMPs
Yes
Single Family Residential
7% 0%
39.6 2.77 0 7.0% 0.0% 238.4
39.6 2.77 0 7.0% 0.0% 239.6
39.6 33.79 0.98 85.3% 2.5% 45.2
Multi-Family Residential
19% 0%
34.7 6.59 0 19.0% 0.0% 1921.4
34.7 6.59 0 19.0% 0.0% 1921.4
34.7 9.78 0 28.2% 0.0% 1667.9
Commercial, Industrial, and Community Use
5% 0%
3.7 0.18 0 4.9% 0.0% 399
3.8 0.19 0 5.0% 0.0% 515.7
3.8 1.74 0 45.8% 0.0% 314.9
Key
The LT Info Stormwater Tools will be used to check the parcel BMP percentages annually for the CIVph2 BMP Registration. If/when the percentages appear to change, Washoe County will alert TRPA that a follow up BMP Recertification may be beneficial for all parties.
The LT Info Stormwater Tools will be used to check the parcel BMP percentages annually for the CIVph2 BMP Registration. If/when the percentages appear to change, Washoe County will alert TRPA that a follow up BMP Recertification may be beneficial for all parties.
Other Pollutant Control Strategies

No other pollutant control strategies implemented in this registration