Overview
2026-2030 NDOT Road Registration
Road Registration
Approved

10/01/2025 to 09/30/2030 (5 years)
394 credits
394 credits (100%)

Road Registration Area
Declarations
Credit Schedule
10/1/2025
5 years
09/30/2030
This registration should provide the annual credits through WY2030 based on the ILA. This registration includes the HWY50, SR28 and SR431 road sections from the 2025 Road Registration along with the new HWY50 sections from Kahle Dr to Skyland GID.

100%
394
394
PLRM Models and Load Reduction
2818 (Project20)
Baseline (Scenario1) Baseline Scenario 100%
RdOps26 (Scenario2) Road Operations Scenario 100%
2859 (Project17)
Baseline (Scenario1) Baseline Scenario 20%
RdOps26 (Scenario2) Road Operations Scenario 20%
2860 (Project16)
Baseline (Scenario1) Baseline Scenario 60%
RdOps26 (Scenario2) Road Operations Scenario 60%
5001 (Project2)
Baseline (Scenario1) Baseline Scenario 5%
RdOps25 (Scenario2) Road Operations Scenario 5%
5002adg_ZCWQIP (Project32)
Baseline (Scenario1) Baseline Scenario 100%
RdOps25 (Scenario2) Road Operations Scenario 100%
5003 (Project34)
Baseline (Scenario1) Baseline Scenario 100%
RdOps25 (Scenario2) Road Operations Scenario 100%
5003IB (Project35)
Baseline (Scenario1) Baseline Scenario 40%
RdOps25 (Scenario2) Road Operations Scenario 40%
5006b (Project27)
Baseline (Scenario1) Baseline Scenario 40%
RdOps25 (Scenario2) Road Operations Scenario 40%
5008a (Project25)
Baseline (Scenario1) Baseline Scenario 100%
RdOps25 (Scenario2) Road Operations Scenario 100%
5009bf5006a (Project26)
Baseline (Scenario1) Baseline Scenario 80%
RdOps25 (Scenario2) Road Operations Scenario 80%
5010 (Project29)
Baseline (Scenario1) Baseline Scenario 10%
RdOps25 (Scenario2) Road Operations Scenario 10%
50115012 (Project31)
Baseline (Scenario1) Baseline Scenario 100%
RdOps25 (Scenario2) Road Operations Scenario 100%
5013ab (Project33)
Baseline (Scenario1) Baseline Scenario 100%
RdOps25 (Scenario2) Road Operations Scenario 100%
5014abc (Project1)
Baseline (Scenario1) Baseline Scenario 85%
RdOps25 (Scenario2) Road Operations Scenario 85%
5015 (Project28)
Baseline (Scenario1) Baseline Scenario 0%
RdOps25 (Scenario2) Road Operations Scenario 0%
5016 (Project30)
Baseline (Scenario1) Baseline Scenario 100%
RdOps25 (Scenario2) Road Operations Scenario 100%
5017 (Project4)
Baseline (Scenario1) Baseline Scenario 100%
RdOps25 (Scenario2) Road Operations Scenario 100%
5018_5019 (Project3)
Baseline (Scenario1) Baseline Scenario 100%
RdOps25 (Scenario2) Road Operations Scenario 100%
502a (Project7)
Baseline (Scenario1) Baseline Scenario 20%
RdOps25 (Scenario2) Road Operations Scenario 20%
502b (Project8)
Baseline (Scenario1) Baseline Scenario 80%
RdOps25 (Scenario2) Road Operations Scenario 80%
502c (Project9)
Baseline (Scenario1) Baseline Scenario 100%
RdOps25 (Scenario2) Road Operations Scenario 100%
503a (Project10)
Baseline (Scenario1) Baseline Scenario 60%
RdOps25 (Scenario2) Road Operations Scenario 60%
503b (Project11)
Baseline (Scenario1) Baseline Scenario 20%
RdOps25 (Scenario2) Road Operations Scenario 20%
504 (Project12)
Baseline (Scenario1) Baseline Scenario 10%
RdOps25 (Scenario2) Road Operations Scenario 10%
505ab (Project13)
Baseline (Scenario1) Baseline Scenario 100%
RdOps25 (Scenario2) Road Operations Scenario 100%
505c (Project14)
Baseline (Scenario1) Baseline Scenario 20%
RdOps25 (Scenario2) Road Operations Scenario 20%
506 (Project15)
Baseline (Scenario1) Baseline Scenario 0%
RdOps25 (Scenario2) Road Operations Scenario 0%
PTBMPReg_501PT1 (Project6)
Baseline (Scenario1) Baseline Scenario 20%
RdOps25 (Scenario2) Road Operations Scenario 20%
PTBMPReg_501PT2_6_7_9 (Project5)
Baseline (Scenario1) Baseline Scenario 100%
RdOps25 (Scenario2) Road Operations Scenario 100%
SR28_280828052850A2813 (Project21)
Baseline (Scenario1) Baseline Scenario 100%
RdOps26 (Scenario2) Road Operations Scenario 100%
SR28_28092850B2851 (Project22)
Baseline (Scenario1) Baseline Scenario 80%
RdOps26 (Scenario2) Road Operations Scenario 80%
SR28Beoway2MR (Project18)
Baseline (Scenario1) Baseline Scenario 100%
RdOps26 (Scenario2) Road Operations Scenario 100%
SR28MtRose2Northwood (Project19)
Baseline (Scenario1) Baseline Scenario 100%
RdOps26 (Scenario2) Road Operations Scenario 100%
SR431_lower (Project23)
Baseline (Scenario1) Baseline Scenario 100%
RdOps25 (Scenario2) Road Operations Scenario 100%
SR431_Upper (Project24)
Baseline (Scenario1) Baseline Scenario 100%
RdOps25 (Scenario2) Road Operations Scenario 100%

147,292 401.3 1,201.1 N/A
68,290.9 247.5 961.1 N/A
Load Reduction 79,001.1 153.8 240 394
Road Classes
NDOT 2.5 2.5 86.03 20
502c (Project9) 0.55
502b (Project8) 0.99
502a (Project7) 2.38
PTBMPReg_501PT1 (Project6) 0.69
PTBMPReg_501PT2_6_7_9 (Project5) 2.87
5017 (Project4) 3.36
5003IB (Project35) 0.81
5003 (Project34) 3.23
5013ab (Project33) 3.28
5002adg_ZCWQIP (Project32) 3.93
50115012 (Project31) 3.56
5016 (Project30) 2.47
5018_5019 (Project3) 2.42
5010 (Project29) 2.6
5015 (Project28) 3.96
5006b (Project27) 3.19
5009bf5006a (Project26) 1.54
5008a (Project25) 0.38
SR431_Upper (Project24) 9.75
SR431_lower (Project23) 11.83
5001 (Project2) 4.83
SR28MtRose2Northwood (Project19) 0.32
506 (Project15) 4.99
505c (Project14) 1.16
505ab (Project13) 3.09
504 (Project12) 1.37
503b (Project11) 1.33
503a (Project10) 1.29
5014abc (Project1) 3.86
NDOT 2.6 2.6 33.2 12
SR28_28092850B2851 (Project22) 5.15
SR28_280828052850A2813 (Project21) 5.32
2818 (Project20) 1.69
SR28MtRose2Northwood (Project19) 9.14
SR28Beoway2MR (Project18) 9.25
2859 (Project17) 1.4
2860 (Project16) 1.25
Total: 32