Registration Details
Road Operations
Approved

Select a subcatchment on the left to view model input report

502c

: 502c
: 906
: 1%
: OF_502c

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 0.6 0.6 0 0%
FSP (lbs/yr) 1,079 615 464 43%
TP (lbs/yr) 3 2 1 33%
TN (lbs/yr) 7 6 1 14%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0.6 0.6
Erosion Potential 3 0 0
Roads 0.6 0.6
Unpaved Road 0 0
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Roads 92.15% 92.15% 80%
Unpaved Road 0% 0%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 100% 100%
Protected 0% 0%
Stable 0% 0%
Stable & Protected 0% 0%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

502b

: 502b
: 905
: 1%
: OF_502b

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 1.1 1.1 0 0%
FSP (lbs/yr) 1,744 876 868 50%
TP (lbs/yr) 5 3 2 40%
TN (lbs/yr) 13 10 3 23%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 2.3 2.3
Erosion Potential 3 0.4 0.4
Roads 1 1
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Roads 98.51% 98.51% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 53.59% 53.59%
Protected 0% 0%
Stable 0% 0%
Stable & Protected 46.41% 46.41%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

502a

: 502a
: 905
: 1%
: OF_502a

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 2.6 2.6 0 0%
FSP (lbs/yr) 4,089 2,052 2,037 50%
TP (lbs/yr) 11 7 4 36%
TN (lbs/yr) 30 24 6 20%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 4.8 4.8
Erosion Potential 3 0.6 0.6
Roads 2.5 2.5
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Roads 95.17% 95.17% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 53.06% 53.06%
Protected 0% 0%
Stable 0% 0%
Stable & Protected 46.94% 46.94%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

501PT1

: PTBMPReg_501PT1
: 905
: 1%
: OF_501PT1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 0.8 0.8 0 0%
FSP (lbs/yr) 1,120 526 594 53%
TP (lbs/yr) 3 2 1 33%
TN (lbs/yr) 9 7 2 22%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0.3 0.3
Erosion Potential 3 0.4 0.4
Roads 0.8 0.8
Unpaved Road 0 0
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Roads 86.49% 86.49% 80%
Unpaved Road 0% 0%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 13.49% 13.49%
Protected 0% 0%
Stable 86.51% 86.51%
Stable & Protected 0% 0%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

501PT9

: PTBMPReg_501PT2_6_7_9
: 905
: 1%
: OF_501PT9

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 0.3 0.3 0 0%
FSP (lbs/yr) 435 171 264 61%
TP (lbs/yr) 1 1 0 0%
TN (lbs/yr) 4 3 1 25%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 4 0.6 0.6
Erosion Potential 5 0.8 0.8
Roads 0.6 0.6
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 4 0% 0%
Erosion Potential 5 0% 0%
Roads 51.02% 51.02% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 0% 0%
Stable 0% 0%
Stable & Protected 100% 100%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

501PT7

: PTBMPReg_501PT2_6_7_9
: 905
: 1%
: OF_501PT7

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 1.3 1.3 0 0%
FSP (lbs/yr) 1,697 690 1,007 59%
TP (lbs/yr) 5 3 2 40%
TN (lbs/yr) 14 11 3 21%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0.6 0.6
Erosion Potential 4 1.3 1.3
Erosion Potential 5 0.7 0.7
Roads 1.5 1.5
Unpaved Road 0 0
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Erosion Potential 5 0% 0%
Roads 78.61% 78.61% 80%
Unpaved Road 0% 0%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 0% 0%
Stable 22.65% 22.65%
Stable & Protected 77.35% 77.35%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

501PT6

: PTBMPReg_501PT2_6_7_9
: 905
: 1%
: OF_501PT6_2

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 0.6 0.6 0 0%
FSP (lbs/yr) 847 357 490 58%
TP (lbs/yr) 2 1 1 50%
TN (lbs/yr) 7 6 1 14%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0.1 0.1
Erosion Potential 3 0.3 0.3
Roads 0.6 0.6
Unpaved Road 0 0
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Roads 94.52% 94.52% 80%
Unpaved Road 0% 0%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 0% 0%
Stable 48.56% 48.56%
Stable & Protected 51.44% 51.44%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

501PT2

: PTBMPReg_501PT2_6_7_9
: 905
: 1%
: OF_501PT6_2

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 0.9 0.9 0 0%
FSP (lbs/yr) 1,221 521 700 57%
TP (lbs/yr) 3 2 1 33%
TN (lbs/yr) 10 8 2 20%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0.9 0.9
Erosion Potential 3 0.4 0.4
Roads 0.9 0.9
Unpaved Road 0 0
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Roads 90.49% 90.49% 80%
Unpaved Road 0% 0%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 0% 0%
Stable 57.97% 57.97%
Stable & Protected 42.03% 42.03%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

5017

: 5017
: 904
: 5%
: OF_5017

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 3.8 3.8 0 0%
FSP (lbs/yr) 5,030 2,017 3,013 60%
TP (lbs/yr) 14 8 6 43%
TN (lbs/yr) 42 33 9 21%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 1 0 0
Erosion Potential 2 0.4 0.4
Erosion Potential 3 2 2
Erosion Potential 4 1.9 1.9
Erosion Potential 5 0.3 0.3
Roads 4 4
Unpaved Road 0.1 0.1
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 1 0% 0%
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Erosion Potential 5 0% 0%
Roads 84% 84% 80%
Unpaved Road 0% 0%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 3.43% 3.43%
Protected 0% 0%
Stable 0% 0%
Stable & Protected 96.57% 96.57%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

5018

: 5018_5019
: 903
: 5%
: OF_5018

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 1.1 1.1 0 0%
FSP (lbs/yr) 1,656 766 890 54%
TP (lbs/yr) 4 3 1 25%
TN (lbs/yr) 13 10 3 23%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Roads 1.4 1.4
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Roads 69.28% 69.28% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 22.34% 22.34%
Protected 0% 0%
Stable 36.81% 36.81%
Stable & Protected 40.84% 40.84%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

5019

: 5018_5019
: 903
: 5%
: OF_5019

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 1.7 1.7 0 0%
FSP (lbs/yr) 2,385 1,057 1,328 56%
TP (lbs/yr) 6 4 2 33%
TN (lbs/yr) 19 15 4 21%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0 0
Roads 1.8 1.8
Unpaved Road 0.4 0.4
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Roads 80.59% 80.59% 80%
Unpaved Road 0% 0%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 12.89% 12.89%
Protected 0% 0%
Stable 36.17% 36.17%
Stable & Protected 50.94% 50.94%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

431009

: SR431_Upper
: 818
: 10%
: OF_431009

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 0.5 0.5 0 0%
FSP (lbs/yr) 816 419 397 49%
TP (lbs/yr) 2 1 1 50%
TN (lbs/yr) 6 5 1 17%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0.1 0.1
Erosion Potential 3 0.8 0.8
Roads 0.4 0.4
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Roads 94.7% 94.7% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 47.2% 47.2%
Protected 0% 0%
Stable 52.8% 52.8%
Stable & Protected 0% 0%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 74 74 10 - 80%
ICIA 26 26
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

431009CF

: SR431_Upper
: 818
: 10%
: OF_431009CF

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 2.7 2.7 0 0%
FSP (lbs/yr) 4,071 1,923 2,148 53%
TP (lbs/yr) 11 7 4 36%
TN (lbs/yr) 32 25 7 22%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0 0
Erosion Potential 3 4.4 4.4
Roads 1.8 1.8
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Roads 98.84% 98.84% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 16.55% 16.55%
Protected 0% 0%
Stable 80.15% 80.15%
Stable & Protected 3.3% 3.3%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 83 83 10 - 80%
ICIA 17 17
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

431019

: SR431_Upper
: 818
: 10%
: OF_431019

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 0.5 0.5 0 0%
FSP (lbs/yr) 711 318 393 55%
TP (lbs/yr) 2 1 1 50%
TN (lbs/yr) 6 5 1 17%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0.3 0.3
Erosion Potential 3 0.8 0.8
Roads 0.4 0.4
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Roads 95.59% 95.59% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 0% 0%
Stable 94.89% 94.89%
Stable & Protected 5.11% 5.11%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 60 60 10 - 80%
ICIA 40 40
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

431018

: SR431_Upper
: 818
: 10%
: OF_431018

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 0.9 0.9 0 0%
FSP (lbs/yr) 1,204 516 688 57%
TP (lbs/yr) 3 2 1 33%
TN (lbs/yr) 10 8 2 20%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 1 1
Roads 0.6 0.6
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Roads 93.6% 93.6% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 0% 0%
Stable 60.78% 60.78%
Stable & Protected 39.22% 39.22%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

431050

: SR431_Upper
: 818
: 10%
: OF_431050

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 0.9 0.9 0 0%
FSP (lbs/yr) 1,230 531 699 57%
TP (lbs/yr) 3 2 1 33%
TN (lbs/yr) 10 8 2 20%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0 0
Erosion Potential 3 0.7 0.7
Roads 0.6 0.6
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Roads 99.81% 99.81% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 0% 0%
Stable 66.57% 66.57%
Stable & Protected 33.43% 33.43%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 50 50 10 - 80%
ICIA 50 50
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

431050CF

: SR431_Upper
: 818
: 10%
: OF_431050

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 2.1 2.1 0 0%
FSP (lbs/yr) 2,832 1,129 1,703 60%
TP (lbs/yr) 8 4 4 50%
TN (lbs/yr) 24 19 5 21%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 2.6 2.6
Roads 1.5 1.5
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Roads 96.44% 96.44% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 0% 0%
Stable 9.53% 9.53%
Stable & Protected 90.47% 90.47%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 92 92 10 - 80%
ICIA 8 8
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

431013

: SR431_Upper
: 818
: 10%
: OF_431013

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 0.4 0.4 0 0%
FSP (lbs/yr) 514 230 284 55%
TP (lbs/yr) 1 1 0 0%
TN (lbs/yr) 4 3 1 25%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 1.5 1.5
Roads 0.4 0.4
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Roads 77.57% 77.57% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 0% 0%
Stable 97.61% 97.61%
Stable & Protected 2.39% 2.39%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 69 69 10 - 80%
ICIA 31 31
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

431010a

: SR431_Upper
: 818
: 10%
: OF_431010a

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 3 3 0 0%
FSP (lbs/yr) 4,106 1,695 2,411 59%
TP (lbs/yr) 11 7 4 36%
TN (lbs/yr) 34 27 7 21%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 1.3 1.3
Erosion Potential 4 1.5 1.5
Erosion Potential 5 0.6 0.6
Roads 2.8 2.8
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Erosion Potential 5 0% 0%
Roads 70.5% 70.5% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 0% 0%
Stable 33.22% 33.22%
Stable & Protected 66.78% 66.78%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

431010c

: SR431_Upper
: 818
: 10%
: OF_431010c

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 1.5 1.5 0 0%
FSP (lbs/yr) 2,067 890 1,177 57%
TP (lbs/yr) 6 3 3 50%
TN (lbs/yr) 17 13 4 24%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0 0
Erosion Potential 4 1.6 1.6
Erosion Potential 5 0.4 0.4
Roads 1.2 1.2
Unpaved Road 0.1 0.1
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Erosion Potential 5 0% 0%
Roads 85.76% 85.76% 80%
Unpaved Road 0% 0%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 1.32% 1.32%
Protected 0% 0%
Stable 59.66% 59.66%
Stable & Protected 39.02% 39.02%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 93 93 10 - 80%
ICIA 7 7
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

431010cCF

: SR431_Upper
: 818
: 10%
: OF_431010cCF

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 0.5 0.5 0 0%
FSP (lbs/yr) 693 293 400 58%
TP (lbs/yr) 2 1 1 50%
TN (lbs/yr) 6 5 1 17%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 4 0.8 0.8
Erosion Potential 5 0.2 0.2
Roads 0.3 0.3
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 4 0% 0%
Erosion Potential 5 0% 0%
Roads 100% 100% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 0% 0%
Stable 50.41% 50.41%
Stable & Protected 49.59% 49.59%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

431011

: SR431_Upper
: 818
: 10%
: OF_431011

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 1.6 1.6 0 0%
FSP (lbs/yr) 2,165 925 1,240 57%
TP (lbs/yr) 6 3 3 50%
TN (lbs/yr) 18 14 4 22%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0 0
Erosion Potential 4 1.8 1.8
Roads 1 1
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Roads 98.72% 98.72% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 0% 0%
Stable 58.74% 58.74%
Stable & Protected 41.26% 41.26%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

431001

: SR431_lower
: 818
: 10%
: WCDB0022

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 1 1 0 0%
FSP (lbs/yr) 1,633 863 770 47%
TP (lbs/yr) 4 3 1 25%
TN (lbs/yr) 12 9 3 25%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 1.5 1.5
Roads 0.8 0.8
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Roads 78.81% 78.81% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 59.92% 59.92%
Protected 0% 0%
Stable 40.08% 40.08%
Stable & Protected 0% 0%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.50 100%
2.60 0%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

2862b

: SR431_lower
: 818
: 10%
: WCDB0025

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 1.3 1.3 0 0%
FSP (lbs/yr) 1,629 640 989 61%
TP (lbs/yr) 4 3 1 25%
TN (lbs/yr) 14 11 3 21%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 1.1 1.1
Erosion Potential 4 0.5 0.5
Roads 0.8 0.8
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Roads 99.05% 99.05% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 0% 0%
Stable 0% 0%
Stable & Protected 100% 100%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.50 100%
2.60 0%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

431002

: SR431_lower
: 818
: 10%
: WCDB0025

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 2.4 2.4 0 0%
FSP (lbs/yr) 3,187 1,314 1,873 59%
TP (lbs/yr) 9 5 4 44%
TN (lbs/yr) 27 21 6 22%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 1.9 1.9
Erosion Potential 4 0.1 0.1
Roads 2.2 2.2
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Roads 77.37% 77.37% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 0% 0%
Stable 32.28% 32.28%
Stable & Protected 67.72% 67.72%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 89 89 10 - 80%
ICIA 11 11
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

2862a

: SR431_lower
: 818
: 10%
: WCDB0017

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 0.6 0.6 0 0%
FSP (lbs/yr) 751 295 456 61%
TP (lbs/yr) 2 1 1 50%
TN (lbs/yr) 6 5 1 17%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 1 0.9
Roads 0.4 0.4
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Roads 93.1% 93.1% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 0% 0%
Stable 0% 0%
Stable & Protected 100% 100%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

431003

: SR431_lower
: 818
: 10%
: OF_431003

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 1.2 1.2 0 0%
FSP (lbs/yr) 1,621 692 929 57%
TP (lbs/yr) 4 3 1 25%
TN (lbs/yr) 13 11 2 15%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 1.4 1.4
Erosion Potential 4 0.1 0.1
Roads 0.9 0.9
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Roads 84.93% 84.93% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 0% 0%
Stable 58.01% 58.01%
Stable & Protected 41.99% 41.99%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

431004

: SR431_lower
: 818
: 10%
: OF_431004

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 2.6 2.6 0 0%
FSP (lbs/yr) 3,689 1,585 2,104 57%
TP (lbs/yr) 10 6 4 40%
TN (lbs/yr) 30 24 6 20%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 3 3
Erosion Potential 4 1.1 1.1
Roads 1.9 1.9
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Roads 91.24% 91.24% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 0% 0%
Stable 62.88% 62.88%
Stable & Protected 37.12% 37.12%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

431005

: SR431_lower
: 818
: 10%
: OF_431005

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 4.9 4.9 0 0%
FSP (lbs/yr) 6,551 2,674 3,877 59%
TP (lbs/yr) 18 10 8 44%
TN (lbs/yr) 55 43 12 22%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 5.1 5.1
Erosion Potential 4 2 2
Roads 6.8 6.8
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Roads 46.3% 46.3% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 0% 0%
Stable 25.6% 25.6%
Stable & Protected 74.4% 74.4%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 98 98 10 - 80%
ICIA 2 2
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

431006b

: SR431_lower
: 818
: 10%
: OF_431006b

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 0.6 0.6 0 0%
FSP (lbs/yr) 765 300 465 61%
TP (lbs/yr) 2 1 1 50%
TN (lbs/yr) 7 5 2 29%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0.6 0.6
Erosion Potential 3 0.6 0.6
Erosion Potential 4 0 0
Roads 0.4 0.4
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Roads 94.66% 94.66% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 0% 0%
Stable 0% 0%
Stable & Protected 100% 100%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

431007b

: SR431_lower
: 818
: 10%
: OF_431007b

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 1.8 1.8 0 0%
FSP (lbs/yr) 2,394 952 1,442 60%
TP (lbs/yr) 7 4 3 43%
TN (lbs/yr) 20 16 4 20%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0.6 0.6
Erosion Potential 3 3.6 3.6
Roads 1.3 1.3
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Roads 91.23% 91.23% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 0% 0%
Stable 8.05% 8.05%
Stable & Protected 91.95% 91.95%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

431008

: SR431_lower
: 818
: 10%
: OF_431008

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 0.7 0.7 0 0%
FSP (lbs/yr) 1,057 471 586 55%
TP (lbs/yr) 3 2 1 33%
TN (lbs/yr) 9 7 2 22%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 1.2 1.2
Roads 0.6 0.6
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Roads 79.88% 79.88% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 0% 0%
Stable 92.97% 92.97%
Stable & Protected 7.03% 7.03%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

431020

: SR431_lower
: 818
: 10%
: OF_431020

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 0.1 0.1 0 0%
FSP (lbs/yr) 121 55 66 55%
TP (lbs/yr) 0 0 0 NaN
TN (lbs/yr) 1 1 0 0%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0 0
Erosion Potential 3 0.9 0.9
Roads 0.1 0.1
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Roads 75.43% 75.43% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 0% 0%
Stable 100% 100%
Stable & Protected 0% 0%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.4 100%
2.5 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 66 66 10 - 80%
ICIA 34 34
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

431020CF

: SR431_lower
: 818
: 10%
: OF_431020

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 0.8 0.8 0 0%
FSP (lbs/yr) 1,084 431 653 60%
TP (lbs/yr) 3 2 1 33%
TN (lbs/yr) 9 7 2 22%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0 0
Erosion Potential 3 0.8 0.8
Roads 0.6 0.6
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Roads 95.21% 95.21% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 0% 0%
Stable 8.15% 8.15%
Stable & Protected 91.85% 91.85%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 89 89 10 - 80%
ICIA 11 11
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

2809

: SR28_28092850B2851
: 918
: 5%
: OF_2809

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 1.8 1.8 0 0%
FSP (lbs/yr) 2,389 1,406 983 41%
TP (lbs/yr) 7 5 2 29%
TN (lbs/yr) 20 17 3 15%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 1 0.2 0.2
Erosion Potential 2 0.4 0.4
Erosion Potential 3 1.3 1.3
Roads 1.4 1.4
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 1 0% 0%
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Roads 99.18% 99.18% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 56.03% 56.03%
Protected 0% 0%
Stable 0% 0%
Stable & Protected 43.97% 43.97%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.70 100%
2.60 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

2850BGn

: SR28_28092850B2851
: 918
: 5%
: OF_2850

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 2.2 2.2 0 0%
FSP (lbs/yr) 2,718 1,513 1,205 44%
TP (lbs/yr) 8 5 3 38%
TN (lbs/yr) 24 20 4 17%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 2 2
Erosion Potential 3 0.7 0.7
Roads 2 2
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Roads 90.98% 90.98% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 38.7% 38.7%
Protected 0% 0%
Stable 0% 0%
Stable & Protected 61.3% 61.3%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.70 100%
2.60 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 95 95 10 - 80%
ICIA 5 5
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

2850B

: SR28_28092850B2851
: 918
: 1%
: OF_2850

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 1.2 1.2 0 0%
FSP (lbs/yr) 1,592 923 669 42%
TP (lbs/yr) 4 3 1 25%
TN (lbs/yr) 14 12 2 14%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0.6 0.6
Erosion Potential 3 1.2 1.2
Roads 1.4 1.4
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Roads 91.59% 91.59% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 34.82% 34.82%
Protected 0% 0%
Stable 65.18% 65.18%
Stable & Protected 0% 0%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.70 100%
2.60 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 66 66 10 - 80%
ICIA 34 34
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

2851

: SR28_28092850B2851
: 918
: 1%
: OF_2850

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 0.5 0.5 0 0%
FSP (lbs/yr) 724 472 252 35%
TP (lbs/yr) 2 1 1 50%
TN (lbs/yr) 5 5 0 0%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 1.4 1.4
Erosion Potential 3 0.3 0.3
Roads 1.1 1.1
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Roads 60.26% 60.26% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 100% 100%
Protected 0% 0%
Stable 0% 0%
Stable & Protected 0% 0%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.70 100%
2.60 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 51 51 10 - 80%
ICIA 49 49
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

2808

: SR28_280828052850A2813
: 919
: 1%
: OF_2808

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 0.3 0.3 0 0%
FSP (lbs/yr) 0 0 0 NaN
TP (lbs/yr) 0 0 0 NaN
TN (lbs/yr) 0 0 0 NaN
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0.5 0.5
Roads 0.2 0.2
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Roads 100% 100% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 100% 100%
Protected 0% 0%
Stable 0% 0%
Stable & Protected 0% 0%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.60 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 0 0 10 - 80%
ICIA 100 100
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

2808TV

: SR28_280828052850A2813
: 919
: 1%
: WCTV0011

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 2.6 2.6 0 0%
FSP (lbs/yr) 3,388 1,526 1,862 55%
TP (lbs/yr) 9 6 3 33%
TN (lbs/yr) 29 23 6 21%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 2.1 2.1
Roads 2.4 2.4
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Roads 94.19% 94.19% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 23.52% 23.52%
Protected 0% 0%
Stable 0% 0%
Stable & Protected 76.48% 76.48%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 64.16%
1.70 35.84%
2.60 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 76 76 10 - 80%
ICIA 24 24
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

2805

: SR28_280828052850A2813
: 919
: 5%
: OF_2805

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 0.8 0.8 0 0%
FSP (lbs/yr) 1,263 822 441 35%
TP (lbs/yr) 3 2 1 33%
TN (lbs/yr) 10 8 2 20%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0.3 0.3
Erosion Potential 3 0.4 0.4
Erosion Potential 4 0.2 0.2
Roads 0.7 0.7
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Roads 85.55% 85.55% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 100% 100%
Protected 0% 0%
Stable 0% 0%
Stable & Protected 0% 0%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.70 100%
2.60 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

2805DB

: SR28_280828052850A2813
: 919
: 5%
: WCTV0020n03

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 1.2 1.2 0 0%
FSP (lbs/yr) 1,881 1,225 656 35%
TP (lbs/yr) 5 4 1 20%
TN (lbs/yr) 14 12 2 14%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0.6 0.6
Erosion Potential 3 0.7 0.7
Erosion Potential 4 0 0
Roads 0.9 0.9
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Roads 97.59% 97.59% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 100% 100%
Protected 0% 0%
Stable 0% 0%
Stable & Protected 0% 0%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.70 100%
2.60 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

2850A

: SR28_280828052850A2813
: 919
: 5%
: WCTV0021

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 0.8 0.8 0 0%
FSP (lbs/yr) 816 390 426 52%
TP (lbs/yr) 2 2 0 0%
TN (lbs/yr) 8 7 1 13%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0.5 0.5
Roads 0.6 0.6
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Roads 95.9% 95.9% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 0% 0%
Stable 18.22% 18.22%
Stable & Protected 81.78% 81.78%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.70 100%
2.60 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

2813

: SR28_280828052850A2813
: 919
: 1%
: WCTV0016

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 0.9 0.9 0 0%
FSP (lbs/yr) 1,224 755 469 38%
TP (lbs/yr) 3 2 1 33%
TN (lbs/yr) 10 8 2 20%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 2 2
Erosion Potential 3 0.9 0.9
Erosion Potential 4 0.1 0.1
Roads 1.1 1.1
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Roads 73.24% 73.24% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 74.29% 74.29%
Protected 0% 0%
Stable 0% 0%
Stable & Protected 25.71% 25.71%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.70 100%
2.60 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 78 78 10 - 80%
ICIA 22 22
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

2818

: 2818
: 858
: 5%
: OF_2818

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 2.3 2.3 0 0%
FSP (lbs/yr) 3,308 1,464 1,844 56%
TP (lbs/yr) 9 5 4 44%
TN (lbs/yr) 26 20 6 23%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 2.8 2.8
Roads 1.7 1.7
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Roads 99.19% 99.19% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 30.58% 30.58%
Protected 0% 0%
Stable 20.45% 20.45%
Stable & Protected 48.98% 48.98%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.60 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 55 55 10 - 80%
ICIA 45 45
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

5001

: 5001
: 901
: 1%
: OF_5001

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 5.3 5.3 0 0%
FSP (lbs/yr) 7,328 3,138 4,190 57%
TP (lbs/yr) 20 12 8 40%
TN (lbs/yr) 60 48 12 20%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0 0
Erosion Potential 3 0 0
Roads 6.3 6.3
Unpaved Road 0 0
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Roads 76.67% 76.67% 80%
Unpaved Road 0% 0%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 4.08% 4.08%
Protected 0% 0%
Stable 44% 44%
Stable & Protected 51.92% 51.92%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

2863

: SR28MtRose2Northwood
: 816
: 5%
: OF_2863

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 1 1 0 0%
FSP (lbs/yr) 1,764 930 834 47%
TP (lbs/yr) 4 3 1 25%
TN (lbs/yr) 12 10 2 17%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0.9 0.9
Roads 0.8 0.8
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Roads 98.16% 98.16% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 85.27% 85.27%
Protected 0% 0%
Stable 0% 0%
Stable & Protected 14.73% 14.73%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.60 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

2863Gn

: SR28MtRose2Northwood
: 816
: 5%
: OF_2863Gn

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 1.2 1.2 0 0%
FSP (lbs/yr) 1,533 553 980 64%
TP (lbs/yr) 4 2 2 50%
TN (lbs/yr) 13 10 3 23%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 4.4 4.4
Roads 1 1
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Roads 94.1% 94.1% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 0% 0%
Stable 0% 0%
Stable & Protected 100% 100%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.50 0%
2.60 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

2864

: SR28MtRose2Northwood
: 816
: 5%
: OF_2864

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 0.7 0.7 0 0%
FSP (lbs/yr) 886 319 567 64%
TP (lbs/yr) 2 1 1 50%
TN (lbs/yr) 8 6 2 25%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 1.5 1.5
Roads 0.5 0.5
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Roads 100% 100% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 0% 0%
Stable 0% 0%
Stable & Protected 100% 100%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.60 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

2804

: SR28MtRose2Northwood
: 816
: 1%
: OF_2804

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 3.3 3.3 0 0%
FSP (lbs/yr) 4,360 1,637 2,723 62%
TP (lbs/yr) 12 7 5 42%
TN (lbs/yr) 37 28 9 24%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 3.7 3.7
Roads 3.2 3.2
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Roads 96.54% 96.54% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 0% 0%
Stable 23% 23%
Stable & Protected 77% 77%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.60 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 68 68 10 - 80%
ICIA 32 32
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

2814CIV2

: SR28MtRose2Northwood
: 816
: 5%
: OF_2814CIV2

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 1.8 1.8 0 0%
FSP (lbs/yr) 2,293 827 1,466 64%
TP (lbs/yr) 6 3 3 50%
TN (lbs/yr) 20 15 5 25%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 1.7 1.7
Roads 1.3 1.3
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Roads 100% 100% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 0% 0%
Stable 0% 0%
Stable & Protected 100% 100%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.60 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

2815

: SR28MtRose2Northwood
: 816
: 1%
: OF_2815

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 1.6 1.6 0 0%
FSP (lbs/yr) 2,047 738 1,309 64%
TP (lbs/yr) 6 3 3 50%
TN (lbs/yr) 17 13 4 24%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 1 1
Roads 1.9 1.9
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Roads 66.95% 66.95% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 0% 0%
Stable 0% 0%
Stable & Protected 100% 100%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.60 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

2816IB

: SR28MtRose2Northwood
: 816
: 5%
: WCTV0013n19

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 0.4 0.4 0 0%
FSP (lbs/yr) 204 204 0 0%
TP (lbs/yr) 1 1 0 0%
TN (lbs/yr) 3 3 0 0%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0.5 0.5
Roads 0.4 0.4
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Roads 79.28% 79.28% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 0% 0%
Stable 0% 0%
Stable & Protected 100% 100%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
2.5 100% 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

2816TV

: SR28MtRose2Northwood
: 816
: 5%
: WCTV0009

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 1.6 1.6 0 0%
FSP (lbs/yr) 2,050 739 1,311 64%
TP (lbs/yr) 6 3 3 50%
TN (lbs/yr) 17 13 4 24%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0.7 0.7
Roads 1.3 1.3
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Roads 96.33% 96.33% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 0% 0%
Stable 0% 0%
Stable & Protected 100% 100%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.60 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

2858

: SR28Beoway2MR
: 676
: 5%
: OF_2858

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 2.8 2.8 0 0%
FSP (lbs/yr) 4,010 1,710 2,300 57%
TP (lbs/yr) 11 6 5 45%
TN (lbs/yr) 32 25 7 22%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 1 0 0
Erosion Potential 2 1.7 1.7
Erosion Potential 3 1.3 1.3
Roads 2.5 2.5
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 1 0% 0%
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Roads 74.96% 74.96% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 17.94% 17.94%
Protected 1.49% 1.49%
Stable 36.31% 36.31%
Stable & Protected 44.26% 44.26%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.60 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

2853

: SR28Beoway2MR
: 676
: 5%
: OF_2853

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 0.4 0.4 0 0%
FSP (lbs/yr) 558 218 340 61%
TP (lbs/yr) 2 1 1 50%
TN (lbs/yr) 5 4 1 20%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 1 0 0
Erosion Potential 2 1.2 1.2
Erosion Potential 3 0.1 0.1
Erosion Potential 4 0 0
Roads 0.4 0.4
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 1 0% 0%
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Roads 68.43% 68.43% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 0% 0%
Stable 49.52% 49.52%
Stable & Protected 50.48% 50.48%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.60 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

2854

: SR28Beoway2MR
: 676
: 5%
: OF_2854

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 0.5 0.5 0 0%
FSP (lbs/yr) 692 288 404 58%
TP (lbs/yr) 2 1 1 50%
TN (lbs/yr) 6 4 2 33%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0.9 0.9
Erosion Potential 3 0.6 0.6
Erosion Potential 4 0.3 0.3
Roads 0.5 0.5
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Roads 65.09% 65.09% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 14.75% 14.75%
Protected 0% 0%
Stable 34.57% 34.57%
Stable & Protected 50.68% 50.68%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.60 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

2857

: SR28Beoway2MR
: 676
: 1%
: OF_2857

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 0.4 0.4 0 0%
FSP (lbs/yr) 680 321 359 53%
TP (lbs/yr) 2 1 1 50%
TN (lbs/yr) 5 4 1 20%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0.9 0.9
Erosion Potential 3 0.3 0.3
Erosion Potential 4 0.3 0.3
Roads 0.5 0.5
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Roads 58.08% 58.08% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 51.03% 51.03%
Protected 0% 0%
Stable 0.55% 0.55%
Stable & Protected 48.41% 48.41%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.60 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

2855

: SR28Beoway2MR
: 676
: 5%
: OF_2855

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 2 2 0 0%
FSP (lbs/yr) 2,767 1,083 1,684 61%
TP (lbs/yr) 7 4 3 43%
TN (lbs/yr) 23 18 5 22%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 2.5 2.5
Erosion Potential 3 1.4 1.4
Erosion Potential 4 0.4 0.4
Roads 1.7 1.7
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Roads 80.59% 80.59% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 0.35% 0.35%
Stable 48.56% 48.56%
Stable & Protected 51.1% 51.1%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.60 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

2810

: SR28Beoway2MR
: 676
: 5%
: OF_2810

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 1 1 0 0%
FSP (lbs/yr) 1,509 656 853 57%
TP (lbs/yr) 4 2 2 50%
TN (lbs/yr) 12 9 3 25%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 1.7 1.7
Erosion Potential 4 0.4 0.4
Roads 0.7 0.7
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Roads 97.32% 97.32% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 6.9% 6.9%
Protected 49.82% 49.82%
Stable 0% 0%
Stable & Protected 43.28% 43.28%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.60 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

2856

: SR28Beoway2MR
: 676
: 5%
: OF_2856

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 1.1 1.1 0 0%
FSP (lbs/yr) 1,722 811 911 53%
TP (lbs/yr) 4 3 1 25%
TN (lbs/yr) 13 10 3 23%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 2.2 2.2
Erosion Potential 4 0.3 0.3
Roads 0.8 0.8
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Roads 96.47% 96.47% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 50.22% 50.22%
Protected 0.86% 0.86%
Stable 0% 0%
Stable & Protected 48.93% 48.93%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.60 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 91 91 10 - 80%
ICIA 9 9
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

2821

: SR28Beoway2MR
: 676
: 1%
: OF_2821

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 1 1 0 0%
FSP (lbs/yr) 1,912 1,047 865 45%
TP (lbs/yr) 5 3 2 40%
TN (lbs/yr) 13 10 3 23%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 2.5 2.5
Roads 1.1 1.1
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Roads 85.63% 85.63% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 100% 100%
Protected 0% 0%
Stable 0% 0%
Stable & Protected 0% 0%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.60 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 69 69 10 - 80%
ICIA 31 31
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

2821IB

: SR28Beoway2MR
: 676
: 1%
: OF_2821IB

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 1 1 0 0%
FSP (lbs/yr) 1,822 982 840 46%
TP (lbs/yr) 5 3 2 40%
TN (lbs/yr) 12 10 2 17%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 1.1 1.1
Roads 0.7 0.7
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Roads 98.8% 98.8% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 93.84% 93.84%
Protected 0% 0%
Stable 0% 0%
Stable & Protected 6.16% 6.16%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.60 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 87 87 10 - 80%
ICIA 13 13
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

2861

: SR28Beoway2MR
: 676
: 5%
: OF_2861

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 2.7 2.7 0 0%
FSP (lbs/yr) 4,049 1,788 2,261 56%
TP (lbs/yr) 11 6 5 45%
TN (lbs/yr) 31 24 7 23%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 7.8 7.8
Erosion Potential 4 0.2 0.2
Roads 2.2 2.2
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Roads 92.42% 92.42% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 32.4% 32.4%
Protected 0% 0%
Stable 10.99% 10.99%
Stable & Protected 56.61% 56.61%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.60 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 88 88 10 - 80%
ICIA 12 12
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

2859

: 2659
: 601
: 1%
: OF_2859

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 2.3 2.3 0 0%
FSP (lbs/yr) 3,330 1,401 1,929 58%
TP (lbs/yr) 9 5 4 44%
TN (lbs/yr) 27 21 6 22%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0.9 0.9
Erosion Potential 3 1.6 1.6
Roads 2.4 2.4
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Roads 58.46% 58.46% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 12.08% 12.08%
Protected 1.21% 1.21%
Stable 49.69% 49.69%
Stable & Protected 37.03% 37.03%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.60 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

2860

: 2860
: 601
: 1%
: OF_2860

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 1.4 1.4 0 0%
FSP (lbs/yr) 1,886 714 1,172 62%
TP (lbs/yr) 5 3 2 40%
TN (lbs/yr) 16 12 4 25%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0 0
Erosion Potential 3 0.2 0.2
Roads 1 1
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Roads 87.12% 87.12% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 1.23% 1.23%
Protected 0% 0%
Stable 22.7% 22.7%
Stable & Protected 76.07% 76.07%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.60 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

2860TV

: 2860
: 601
: 1%
: WCTV0026

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 0.6 0.6 0 0%
FSP (lbs/yr) 890 374 516 58%
TP (lbs/yr) 2 1 1 50%
TN (lbs/yr) 7 6 1 14%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0 0
Roads 0.4 0.4
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Roads 95.3% 95.3% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 0% 0%
Stable 100% 100%
Stable & Protected 0% 0%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.60 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

506

: 506
: 908
: 1%
: OF_506

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 4.5 4.5 0 0%
FSP (lbs/yr) 6,757 3,194 3,563 53%
TP (lbs/yr) 18 11 7 39%
TN (lbs/yr) 52 41 11 21%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 1 0 0
Erosion Potential 2 0.9 0.9
Erosion Potential 3 4 4
Roads 5.5 5.5
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 1 0% 0%
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Roads 90.71% 90.71% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 36.82% 36.82%
Protected 0% 0%
Stable 0% 0%
Stable & Protected 63.18% 63.18%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

505c

: 505c
: 907
: 1%
: OF_505c

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 1.2 1.2 0 0%
FSP (lbs/yr) 1,889 957 932 49%
TP (lbs/yr) 5 3 2 40%
TN (lbs/yr) 14 11 3 21%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 1 0 0
Erosion Potential 2 1.6 1.6
Erosion Potential 3 0.1 0.1
Roads 1.2 1.2
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 1 0% 0%
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Roads 96.43% 96.43% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 55.87% 55.87%
Protected 0% 0%
Stable 0% 0%
Stable & Protected 44.13% 44.13%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

505a

: 505ab
: 907
: 5%
: OF_505a

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 0.6 0.6 0 0%
FSP (lbs/yr) 720 283 437 61%
TP (lbs/yr) 2 1 1 50%
TN (lbs/yr) 6 5 1 17%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0.5 0.5
Erosion Potential 3 0.6 0.6
Roads 0.6 0.6
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Roads 89.68% 89.68% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 0% 0%
Stable 0% 0%
Stable & Protected 100% 100%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

505aCF

: 505ab
: 907
: 5%
: OF_505aCF

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 0.6 0.6 0 0%
FSP (lbs/yr) 1,017 580 437 43%
TP (lbs/yr) 3 2 1 33%
TN (lbs/yr) 7 6 1 14%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0.5 0.5
Erosion Potential 3 0.6 0.6
Roads 0.6 0.6
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Roads 89.68% 89.68% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 100% 100%
Protected 0% 0%
Stable 0% 0%
Stable & Protected 0% 0%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

505b

: 505ab
: 907
: 1%
: OF_505b

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 2 2 0 0%
FSP (lbs/yr) 3,021 1,413 1,608 53%
TP (lbs/yr) 8 5 3 38%
TN (lbs/yr) 24 19 5 21%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 2.1 2.1
Erosion Potential 3 0.7 0.7
Roads 2.1 2.1
Unpaved Road 0.3 0.3
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Roads 95.71% 95.71% 80%
Unpaved Road 0% 0%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 20.92% 20.92%
Protected 26.42% 26.42%
Stable 0% 0%
Stable & Protected 52.65% 52.65%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

504

: 504
: 907
: 5%
: OF_504

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 1.4 1.4 0 0%
FSP (lbs/yr) 2,219 1,100 1,119 50%
TP (lbs/yr) 6 4 2 33%
TN (lbs/yr) 17 13 4 24%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0.9 0.9
Erosion Potential 3 0.5 0.5
Roads 1.4 1.4
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Roads 97.56% 97.56% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 49.55% 49.55%
Protected 0% 0%
Stable 0% 0%
Stable & Protected 50.45% 50.45%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

503b

: 503b
: 906
: 1%
: OF_503b

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 1.4 1.4 0 0%
FSP (lbs/yr) 2,220 1,104 1,116 50%
TP (lbs/yr) 6 4 2 33%
TN (lbs/yr) 17 13 4 24%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 2.1 2.1
Erosion Potential 3 0.7 0.7
Roads 1.4 1.4
Unpaved Road 0.2 0.2
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Roads 95.27% 95.27% 80%
Unpaved Road 0% 0%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 50.37% 50.37%
Protected 0% 0%
Stable 0% 0%
Stable & Protected 49.63% 49.63%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

503a

: 503a
: 906
: 1%
: OF_503a

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 1.4 1.4 0 0%
FSP (lbs/yr) 2,050 951 1,099 54%
TP (lbs/yr) 5 3 2 40%
TN (lbs/yr) 16 13 3 19%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 1.4 1.4
Erosion Potential 3 1.4 1.4
Roads 1.3 1.3
Unpaved Road 0.1 0.1
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Roads 99.31% 99.31% 80%
Unpaved Road 0% 0%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 26.2% 26.2%
Protected 0% 0%
Stable 24.42% 24.42%
Stable & Protected 49.38% 49.38%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

5014b

: 5014abc
: 901
: 1%
: OF_5014b

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 1.3 1.3 0 0%
FSP (lbs/yr) 1,920 863 1,057 55%
TP (lbs/yr) 5 3 2 40%
TN (lbs/yr) 16 12 4 25%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0 0
Roads 1.4 1.4
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Roads 86.47% 86.47% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 0% 0%
Stable 100% 100%
Stable & Protected 0% 0%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

5014c

: 5014abc
: 901
: 1%
: DCDB0009

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 1.5 1.5 0 0%
FSP (lbs/yr) 1,993 842 1,151 58%
TP (lbs/yr) 5 3 2 40%
TN (lbs/yr) 17 13 4 24%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0 0
Roads 2.1 2.1
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Roads 62.89% 62.89% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 0% 0%
Stable 50.24% 50.24%
Stable & Protected 49.76% 49.76%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

5014a

: 5014abc
: 901
: 1%
: OF_5014a

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 0.9 0.9 0 0%
FSP (lbs/yr) 1,395 702 693 50%
TP (lbs/yr) 4 2 2 50%
TN (lbs/yr) 10 8 2 20%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0.1 0.1
Erosion Potential 3 0 0
Roads 1.9 1.9
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Roads 70.14% 70.14% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 51.72% 51.72%
Protected 0% 0%
Stable 9.69% 9.69%
Stable & Protected 38.59% 38.59%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2.50 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 57 57 10 - 80%
ICIA 43 43
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

Select a Treatment BMP on the left to view model input report

WCDB0025

: SR431_lower
: 2862b, 431002
: 0

Dry Basin Parameters
Design Parameters Baseline Scenario Value Road Operations Scenario Value Default Lower Value Upper Value
Brim Full Draw Down Time (hrs) 60 60 60 48 72
Footprint (sq ft) 1,035 1,035 1,000
Infiltration Rate (in/hr) 0.05 0.05 0.2 0.05 0.5
Water Quality Volume (cu ft) 1,466 1,466 2,500
Characteristic Effluent Concentrations
Pollutant (mg/L) Baseline Scenario Value Road Operations Scenario Value Default Lower Value Mid Value Upper Value
TSS 25 25 25 5.2 18 52
FSP 25 25 25 5.2 18 52
TN 1.1 1.1 1.1 0.59 1 1.6
DIN 0.12 0.12 0.12 0.064 0.11 0.17
TP 0.16 0.16 0.16 0.083 0.15 0.25
SRP 0.05 0.05 0.05 0.026 0.047 0.078

WCDB0017

: SR431_lower
: 2862a
: 0

Dry Basin Parameters
Design Parameters Baseline Scenario Value Road Operations Scenario Value Default Lower Value Upper Value
Brim Full Draw Down Time (hrs) 60 60 60 48 72
Footprint (sq ft) 552 552 1,000
Infiltration Rate (in/hr) 0.05 0.05 0.2 0.05 0.5
Water Quality Volume (cu ft) 138 138 2,500
Characteristic Effluent Concentrations
Pollutant (mg/L) Baseline Scenario Value Road Operations Scenario Value Default Lower Value Mid Value Upper Value
TSS 25 25 25 5.2 18 52
FSP 25 25 25 5.2 18 52
TN 1.1 1.1 1.1 0.59 1 1.6
DIN 0.12 0.12 0.12 0.064 0.11 0.17
TP 0.16 0.16 0.16 0.083 0.15 0.25
SRP 0.05 0.05 0.05 0.026 0.047 0.078

WCDB0022

: SR431_lower
: 431001
: 0

Dry Basin Parameters
Design Parameters Baseline Scenario Value Road Operations Scenario Value Default Lower Value Upper Value
Brim Full Draw Down Time (hrs) 60 60 60 48 72
Footprint (sq ft) 1,665 1,665 1,000
Infiltration Rate (in/hr) 0.05 0.05 0.2 0.05 0.5
Water Quality Volume (cu ft) 1,665 1,665 2,500
Characteristic Effluent Concentrations
Pollutant (mg/L) Baseline Scenario Value Road Operations Scenario Value Default Lower Value Mid Value Upper Value
TSS 25 25 25 5.2 18 52
FSP 25 25 25 5.2 18 52
TN 1.1 1.1 1.1 0.59 1 1.6
DIN 0.12 0.12 0.12 0.064 0.11 0.17
TP 0.16 0.16 0.16 0.083 0.15 0.25
SRP 0.05 0.05 0.05 0.026 0.047 0.078

WCDB0009

: SR28_280828052850A2813
: BMP not set as out node for any subcatchments in the expected scenario
: 0

Dry Basin Parameters
Design Parameters Baseline Scenario Value Road Operations Scenario Value Default Lower Value Upper Value
Brim Full Draw Down Time (hrs) 60 60 60 48 72
Footprint (sq ft) 320 320 1,000
Infiltration Rate (in/hr) 0.05 0.05 0.2 0.05 0.5
Water Quality Volume (cu ft) 730 730 2,500
Characteristic Effluent Concentrations
Pollutant (mg/L) Baseline Scenario Value Road Operations Scenario Value Default Lower Value Mid Value Upper Value
TSS 25 25 25 5.2 18 52
FSP 25 25 25 5.2 18 52
TN 1.1 1.1 1.1 0.59 1 1.6
DIN 0.12 0.12 0.12 0.064 0.11 0.17
TP 0.16 0.16 0.16 0.083 0.15 0.25
SRP 0.05 0.05 0.05 0.026 0.047 0.078

WCTV0011

: SR28_280828052850A2813
: 2808TV
: 0

Treatment Vault Parameters
Design Parameters Baseline Scenario Value Road Operations Scenario Value Default Lower Value Upper Value
Maximum Treatment Flow (cfs) 1 1 0
Characteristic Effluent Concentrations
Pollutant (mg/L) Baseline Scenario Value Road Operations Scenario Value Default Lower Value Mid Value Upper Value
TSS 250 250
FSP 250 250
TN 2.5 2.5
DIN 0.28 0.28
TP 1 1
SRP 0.1 0.1

WCTV0020n03

: SR28_280828052850A2813
: 2805DB
: 0

Treatment Vault Parameters
Design Parameters Baseline Scenario Value Road Operations Scenario Value Default Lower Value Upper Value
Maximum Treatment Flow (cfs) 1 1 0
Characteristic Effluent Concentrations
Pollutant (mg/L) Baseline Scenario Value Road Operations Scenario Value Default Lower Value Mid Value Upper Value
TSS 250 250
FSP 250 250
TN 2.5 2.5
DIN 0.28 0.28
TP 1 1
SRP 0.1 0.1

WCTV0021

: SR28_280828052850A2813
: 2850A
: 0

Treatment Vault Parameters
Design Parameters Baseline Scenario Value Road Operations Scenario Value Default Lower Value Upper Value
Maximum Treatment Flow (cfs) 1 1 0
Characteristic Effluent Concentrations
Pollutant (mg/L) Baseline Scenario Value Road Operations Scenario Value Default Lower Value Mid Value Upper Value
TSS 250 250
FSP 250 250
TN 2.5 2.5
DIN 0.28 0.28
TP 1 1
SRP 0.1 0.1

WCTV0016

: SR28_280828052850A2813
: 2813
: 0

Treatment Vault Parameters
Design Parameters Baseline Scenario Value Road Operations Scenario Value Default Lower Value Upper Value
Maximum Treatment Flow (cfs) 1 1 0
Characteristic Effluent Concentrations
Pollutant (mg/L) Baseline Scenario Value Road Operations Scenario Value Default Lower Value Mid Value Upper Value
TSS 250 250
FSP 250 250
TN 2.5 2.5
DIN 0.28 0.28
TP 1 1
SRP 0.1 0.1

WCTV0013n19

: SR28MtRose2Northwood
: 2816IB
: 0

Treatment Vault Parameters
Design Parameters Baseline Scenario Value Road Operations Scenario Value Default Lower Value Upper Value
Maximum Treatment Flow (cfs) 1 1 0
Characteristic Effluent Concentrations
Pollutant (mg/L) Baseline Scenario Value Road Operations Scenario Value Default Lower Value Mid Value Upper Value
TSS 250 250
FSP 250 250
TN 2.5 2.5
DIN 0.28 0.28
TP 1 1
SRP 0.1 0.1

WCTV0009

: SR28MtRose2Northwood
: 2816TV
: 0

Treatment Vault Parameters
Design Parameters Baseline Scenario Value Road Operations Scenario Value Default Lower Value Upper Value
Maximum Treatment Flow (cfs) 1 1 0
Characteristic Effluent Concentrations
Pollutant (mg/L) Baseline Scenario Value Road Operations Scenario Value Default Lower Value Mid Value Upper Value
TSS 250 250
FSP 250 250
TN 2.5 2.5
DIN 0.28 0.28
TP 1 1
SRP 0.1 0.1

WCTV0026

: 2860
: 2860TV
: 0

Treatment Vault Parameters
Design Parameters Baseline Scenario Value Road Operations Scenario Value Default Lower Value Upper Value
Maximum Treatment Flow (cfs) 1 1 0
Characteristic Effluent Concentrations
Pollutant (mg/L) Baseline Scenario Value Road Operations Scenario Value Default Lower Value Mid Value Upper Value
TSS 250 250
FSP 250 250
TN 2.5 2.5
DIN 0.28 0.28
TP 1 1
SRP 0.1 0.1

DCDB0009

: 5014abc
: 5014c
: 0

Dry Basin Parameters
Design Parameters Baseline Scenario Value Road Operations Scenario Value Default Lower Value Upper Value
Brim Full Draw Down Time (hrs) 60 60 60 48 72
Footprint (sq ft) 1,000 1,000 1,000
Infiltration Rate (in/hr) 0.05 0.05 0.2 0.05 0.5
Water Quality Volume (cu ft) 3,400 3,400 2,500
Characteristic Effluent Concentrations
Pollutant (mg/L) Baseline Scenario Value Road Operations Scenario Value Default Lower Value Mid Value Upper Value
TSS 25 25 25 5.2 18 52
FSP 25 25 25 5.2 18 52
TN 1.1 1.1 1.1 0.59 1 1.6
DIN 0.12 0.12 0.12 0.064 0.11 0.17
TP 0.16 0.16 0.16 0.083 0.15 0.25
SRP 0.05 0.05 0.05 0.026 0.047 0.078