Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 4.4 4.4 0 0%
FSP (lbs/yr) 6,739 4,667 2,072 31%
TP (lbs/yr) 18 14 4 22%
TN (lbs/yr) 52 47 5 10%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 1 0.1 0.1
Erosion Potential 2 0.1 0.1
Roads 3.9 3.9
Unpaved Road 0 0
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 1 0% 0%
Erosion Potential 2 0% 0%
Roads 51.07% 51.07% 80%
Unpaved Road 0% 0%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 100% 100%
Stable 0% 0%
Stable & Protected 0% 0%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 82.55%
1.70 17.45%
2 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.4 0.4
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

ED50PM67f

: ED_50_PM67_f
: 628
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 7.5 7.6 -0.1 -1%
FSP (lbs/yr) 11,378 8,001 3,377 30%
TP (lbs/yr) 30 24 6 20%
TN (lbs/yr) 89 80 9 10%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0.6 0.6
Erosion Potential 3 4.5 4.5
Erosion Potential 4 0.1 0.1
Roads 6.7 6.7
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Roads 74.7% 74.7% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 100% 100%
Stable 0% 0%
Stable & Protected 0% 0%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 78.54%
1.70 21.46%
2 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 60 60 10 - 80%
ICIA 40 40
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.4 0.4
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

ED50PM67e

: ED_50_PM67_e
: 588
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 12.2 12.2 0 0%
FSP (lbs/yr) 16,474 12,690 3,784 23%
TP (lbs/yr) 45 38 7 16%
TN (lbs/yr) 137 126 11 8%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 1.4 1.4
Erosion Potential 3 12 12
Roads 14.5 14.5
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Roads 71.36% 71.36% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 19.22% 19.22%
Protected 63.12% 63.12%
Stable 0% 0%
Stable & Protected 17.66% 17.66%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 29.87%
1.70 70.13%
2 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 36 36 10 - 80%
ICIA 64 64
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.4 0.4
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

Pla28PM9c

: Pla_28_PM9_c
: 600
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 3.1 3.1 0 0%
FSP (lbs/yr) 3,530 2,827 703 20%
TP (lbs/yr) 10 9 1 10%
TN (lbs/yr) 33 31 2 6%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0.2 0.2
Erosion Potential 3 0 0
Erosion Potential 4 0.1 0.1
Roads 3.8 3.8
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Roads 69.01% 69.01% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 48.99% 48.99%
Stable 0% 0%
Stable & Protected 51.01% 51.01%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.70 100%
2 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 75 75 10 - 80%
ICIA 25 25
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.4 0.4
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

Pla28PM9b

: Pla_28_PM9_b
: 532
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 15.5 15.5 0 0%
FSP (lbs/yr) 18,140 12,166 5,974 33%
TP (lbs/yr) 52 41 11 21%
TN (lbs/yr) 167 151 16 10%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0 0
Erosion Potential 4 1.5 1.5
Roads 10.1 10.1
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Roads 86.54% 86.54% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 1.18% 1.18%
Stable 0% 0%
Stable & Protected 98.82% 98.82%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 53.62%
1.70 46.38%
2 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 98 98 10 - 80%
ICIA 2 2
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.2 0.2
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

Pla28PM1v

: Pla_28_PM1_v
: 481
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 3.2 3.2 0 0%
FSP (lbs/yr) 4,265 2,760 1,505 35%
TP (lbs/yr) 12 9 3 25%
TN (lbs/yr) 36 32 4 11%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0 0
Erosion Potential 4 0.6 0.6
Roads 2.1 2.1
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Roads 80.43% 80.43% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 32.53% 32.53%
Stable 0% 0%
Stable & Protected 67.47% 67.47%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 84.17%
1.70 15.83%
2 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.3 0.3
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

Pla28PM1u

: Pla_28_PM1_u
: 481
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 5.9 5.9 0 0%
FSP (lbs/yr) 6,555 4,651 1,904 29%
TP (lbs/yr) 19 16 3 16%
TN (lbs/yr) 63 58 5 8%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0 0
Erosion Potential 4 0 0
Roads 3.6 3.6
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Roads 87.98% 87.98% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 0% 0%
Stable 0% 0%
Stable & Protected 100% 100%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 31.53%
1.70 68.47%
2 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.3 0.3
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

Pla28PM1t

: Pla_28_PM1_t
: 462
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 5 5 0 0%
FSP (lbs/yr) 5,544 4,401 1,143 21%
TP (lbs/yr) 16 14 2 13%
TN (lbs/yr) 54 50 4 7%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Roads 2.8 2.8
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Roads 87.68% 87.68% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 34.43% 34.43%
Stable 0% 0%
Stable & Protected 65.57% 65.57%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.70 100%
2 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

Pla28PM1s

: Pla_28_PM1_s
: 462
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 3.3 3.2 0.1 3%
FSP (lbs/yr) 4,188 3,013 1,175 28%
TP (lbs/yr) 12 10 2 17%
TN (lbs/yr) 37 33 4 11%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0 0
Erosion Potential 3 0 0
Roads 2 2
Unpaved Road 0 0
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Roads 78.64% 78.64% 80%
Unpaved Road 0% 0%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 53.02% 53.02%
Stable 0% 0%
Stable & Protected 46.98% 46.98%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 39.06%
1.70 60.94%
2 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.1 0.1
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

Pla28PM1r

: Pla_28_PM1_r
: 443
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 3.6 3.6 0 0%
FSP (lbs/yr) 5,139 3,274 1,865 36%
TP (lbs/yr) 14 10 4 29%
TN (lbs/yr) 41 36 5 12%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 1 0 0
Erosion Potential 2 0.3 0.3
Erosion Potential 3 0.1 0.1
Roads 2.6 2.6
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 1 0% 0%
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Roads 65.58% 65.58% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 51.94% 51.94%
Stable 0% 0%
Stable & Protected 48.06% 48.06%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.3 0.3
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

Pla28PM1q

: Pla_28_PM1_q
: 423
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 8.5 8.5 0 0%
FSP (lbs/yr) 11,365 7,275 4,090 36%
TP (lbs/yr) 31 24 7 23%
TN (lbs/yr) 95 85 10 11%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 1 0.1 0.1
Erosion Potential 2 0.3 0.3
Erosion Potential 3 0.3 0.3
Roads 5.3 5.3
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 1 0% 0%
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Roads 79.62% 79.62% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 26.02% 26.02%
Stable 0% 0%
Stable & Protected 73.98% 73.98%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 87.14%
1.70 12.86%
2 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.2 0.2
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

Pla28PM1p2

: Pla_28_PM1_p
: 423
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 4.9 4.9 0 0%
FSP (lbs/yr) 5,590 4,482 1,108 20%
TP (lbs/yr) 16 14 2 13%
TN (lbs/yr) 53 49 4 8%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0 0
Erosion Potential 3 0.2 0.2
Roads 3.3 3.3
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Roads 73.49% 73.49% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 50.69% 50.69%
Stable 0% 0%
Stable & Protected 49.31% 49.31%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.70 100%
2.0 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.3 0.3
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

Pla28PM1o

: Pla_28_PM1_o
: 146
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 1.7 1.7 0 0%
FSP (lbs/yr) 1,985 1,591 394 20%
TP (lbs/yr) 6 5 1 17%
TN (lbs/yr) 19 18 1 5%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0 0
Roads 1.3 1.3
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Roads 60.91% 60.91% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 50.09% 50.09%
Stable 0% 0%
Stable & Protected 49.91% 49.91%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.70 100%
2 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.3 0.3
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

ED50PM79a

: ED_50_PM79_a
: 847
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 12.2 12.1 0.1 1%
FSP (lbs/yr) 16,679 10,342 6,337 38%
TP (lbs/yr) 45 34 11 24%
TN (lbs/yr) 138 122 16 12%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0 0
Roads 11.9 11.9
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Roads 90.48% 90.48% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 0% 0%
Stable 50.49% 50.49%
Stable & Protected 49.51% 49.51%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.3 0.3
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

ED50PM77a

: ED_50_PM77_a
: 781
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 18.6 18.6 0 0%
FSP (lbs/yr) 26,242 16,551 9,691 37%
TP (lbs/yr) 70 53 17 24%
TN (lbs/yr) 213 188 25 12%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Roads 17.2 17.2
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Roads 87.1% 87.1% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 8.68% 8.68%
Protected 0% 0%
Stable 44.42% 44.42%
Stable & Protected 46.9% 46.9%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.4 0.4
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

ED50PM75a

: ED_50_PM75_a
: 710
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 29.6 29.6 0 0%
FSP (lbs/yr) 39,075 23,568 15,507 40%
TP (lbs/yr) 106 79 27 25%
TN (lbs/yr) 331 290 41 12%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Roads 19.1 19.1
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Roads 92.14% 92.14% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 1.63% 1.63%
Protected 0% 0%
Stable 0% 0%
Stable & Protected 98.37% 98.37%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.4 0.4
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

ED50PM73b

: ED_50_PM73_b
: 671
: 5%
: InfiltrationBasin1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 7.2 7.2 0 0%
FSP (lbs/yr) 9,734 5,998 3,736 38%
TP (lbs/yr) 26 20 6 23%
TN (lbs/yr) 81 71 10 12%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 4.1 4.1
Erosion Potential 4 1.9 1.9
Roads 5.8 5.8
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Roads 64.54% 64.54% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 3.43% 3.43%
Protected 12.89% 12.89%
Stable 0% 0%
Stable & Protected 83.68% 83.68%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 100 100 10 - 80%
ICIA 0 0
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.4 0.4
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

ED50PM73a

: ED_50_PM73_a
: 669
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 10.2 10.2 0 0%
FSP (lbs/yr) 15,202 9,881 5,321 35%
TP (lbs/yr) 40 31 9 23%
TN (lbs/yr) 119 105 14 12%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 1 1.1 1.1
Erosion Potential 2 3.6 3.6
Erosion Potential 3 5.8 5.8
Erosion Potential 4 0.8 0.8
Roads 8.9 8.9
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 1 0% 0%
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Erosion Potential 4 0% 0%
Roads 64.24% 64.24% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 3.11% 3.11%
Protected 61.22% 61.22%
Stable 0% 0%
Stable & Protected 35.67% 35.67%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 100%
2 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 85 85 10 - 80%
ICIA 15 15
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.4 0.4
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

ED50PM72a

: ED_50_PM72_a
: 668
: 5%
: InfiltrationBasin1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 8.7 8.7 0 0%
FSP (lbs/yr) 9,614 6,872 2,742 29%
TP (lbs/yr) 28 23 5 18%
TN (lbs/yr) 92 85 7 8%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 1 8.4 8.4
Erosion Potential 2 1.9 1.9
Roads 6.8 6.8
Unpaved Road 0 0
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 1 0% 0%
Erosion Potential 2 0% 0%
Roads 64.04% 64.04% 80%
Unpaved Road 0% 0%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 3.82% 3.82%
Stable 0% 0%
Stable & Protected 96.18% 96.18%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.40 30.36%
1.70 69.64%
2 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 92 92 10 - 80%
ICIA 8 8
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.4 0.4
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

ED50PM67g

: ED_50_PM67_g
: 628
: 5%
: Outfall1

Catchment Output Baseline Scenario Value Road Operations Scenario Value Load Reduction % Load Reduction
Volume (ac-ft/yr) 3.7 3.7 0 0%
FSP (lbs/yr) 4,724 3,884 840 18%
TP (lbs/yr) 13 12 1 8%
TN (lbs/yr) 41 39 2 5%
Land Uses
Land Use - Area (acres) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0.3 0.3
Erosion Potential 3 3.5 3.5
Roads 3.6 3.6
Land Use - % Imperviousness Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erosion Potential 2 0% 0%
Erosion Potential 3 0% 0%
Roads 45.96% 45.96% 80%
Road Pollutants
Road Shoulder - % Distribution Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Erodible 0% 0%
Protected 100% 100%
Stable 0% 0%
Stable & Protected 0% 0%
Road Condition Score - % Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
1.70 100%
2 100%
Road Drainage
Pathway Drainage - % Road Area Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
DCIA 94 94 10 - 80%
ICIA 6 6
Infiltration Facilities 0 0
Pervious Channels 0 0
Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Infiltration Facilities 0.5 0.5 0.5 0.05 - 1
Pervious Channels 0.5 0.5 0.5 0.05 - 1
Shoulders 0.4 0.4
Infiltration Facilities Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Storage (cu. ft.) 0 0
Surface Area (sq. ft.) 0 0
Pervious Channels Characteristic Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
Average Slope (%) 1 1
Length (ft) 0 0
Storage Depth (in) 0 0
Width (ft) 0 0
Parcel Drainage
Land Use - % BMP & Source Control Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - % DCIA Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - Ksat Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Storage (in) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment
Land Use - BMP Infiltration Rate (in/hr) Baseline Scenario Value Road Operations Scenario Value Default Recommended Range
No applicable land uses in catchment

Select a Treatment BMP on the left to view model input report

InfiltrationBasin1

: ED_50_PM73_b
: ED50PM73b, ED50PM72a
: 0

Infiltration Basin Parameters
Design Parameters Baseline Scenario Value Road Operations Scenario Value Default Lower Value Upper Value
Footprint (sq ft) 5,290 5,290 1,000
Infiltration Rate (in/hr) 0.4 0.4 0.4 0.05 1.5
Water Quality Volume (cu ft) 21,159 21,159 2,500
Characteristic Effluent Concentrations
Pollutant (mg/L) Baseline Scenario Value Road Operations Scenario Value Default Lower Value Mid Value Upper Value
CECs not applicable

InfiltrationBasin1

: ED_50_PM72_a
: ED50PM73b, ED50PM72a
: 0

Infiltration Basin Parameters
Design Parameters Baseline Scenario Value Road Operations Scenario Value Default Lower Value Upper Value
Footprint (sq ft) 5,290 5,290 1,000
Infiltration Rate (in/hr) 0.4 0.4 0.4 0.05 1.5
Water Quality Volume (cu ft) 21,159 21,159 2,500
Characteristic Effluent Concentrations
Pollutant (mg/L) Baseline Scenario Value Road Operations Scenario Value Default Lower Value Mid Value Upper Value
CECs not applicable