Basics
WCIB0049
Infiltration Basin
1
1
1.35 ft
Mays Blvd infiltration basin installed 10/15/2023 as part of the Lower Wood Creek Phase 2 WQIP. It is articulated block lined.

Benchmark & Threshold Values

Benchmark and Thresholds cannot be edited. To change the Benchmark and Thresholds, remove the Assessments that use these Benchmark and Thresholds, or Edit the Treatment BMP.

Observation Type Benchmark Threshold
Wetland Vegetative Cover 0% 20%
Photos

No photos available.

Location
Assessments
Currently viewing of Download Table
Documents