Basics
WCIF0189to198
Infiltration Basin
13
1
Series of underground infiltration galleries (underground perforated pipes) installed 10/15/2023 as part of the Lower Wood Creek Phase 2 WQIP. These infiltration features are modeled as one infiltration basin in PLRM.

Benchmark & Threshold Values

Benchmark and Thresholds cannot be edited. To change the Benchmark and Thresholds, remove the Assessments that use these Benchmark and Thresholds, or Edit the Treatment BMP.

Observation Type Benchmark Threshold
Material Accumulation using Stadia Rod 0 ft 6.76 ft
Photos

No photos available.

Location
Assessments
Currently viewing of Download Table
Documents

No documents have been uploaded for this Treatment BMP