Overview
East Incline Village Phase I Reg 3 BMP Registration
BMP Registration
Approved

10/01/2019 to 09/30/2034 (15 years)
21 credits
21 credits (100%)

Yes
Yes
No

Registration Area & BMPs
Declarations
Currently viewing of Registration Years Download Table
Credit Schedule
10/1/2019
15 years
09/30/2034
This registration includes post-2004 treatment BMPs from the East Incline Village Phase I and Incline Village Tourist/Fairway Phase II WQIP, and the installation of new stormwater improvements within this registration area during the next 15 years is unlikely. All improvements were in place prior to WY2020, and the establishment date of 1/1/2020 indicates the first year of the credit schedule was WY2020. The 15 year credit schedule starting in WY2020 is reasonable.

100%
21
21
PLRM Models and Load Reduction
EIVph1Reg3BMPReg (Project53)
newBaseline (Scenario3) Baseline Scenario 100%
RdOps (Scenario4) Road Operations Scenario 100%
BMP (Scenario6) Expected Scenario 100%

7,637 30 112 N/A
6,417 28 111 N/A
2,112 9 39 N/A
Load Reduction 4,305 19 72 21
Treatment BMPs
Yes

Infiltration Basin WCIB0039 861 3 13 4 Key No
Infiltration Basin WCIF0001to3 254 1 4 1 Supporting No
Treatment Vault WCTV0001 1 0 1 0 Supporting No
Total 5

No distributed BMPs added to registration

It is the responsibility of Washoe County to monitor and maintain all drainage improvements and treatment BMPs. Washoe County will maintain treatment BMPs that fail annual assessments to standards identified in the TRPA BMP Handbook. Annual assessments are used to assess condition/performance and initiate maintenance on an annual basis. Washoe County will use a vactor truck, excavator, hand crew or other methods necessary to maintain treatment BMPs at or better than expected conditions.
Washoe County plans to inspect all key and essential treatment BMPs in accordance with the protocols described in the BMP RAM User Manual V2 (2ndNature, 2015). These inspections are used to assess condition/performance and initiate maintenance on an annual basis. Additional inspections may occur after major precipitation events.
Parcel BMPs
Yes
Single Family Residential
7% 0%
25.5 1.78 0 7.0% 0.0% 119.5
25.5 1.78 0 7.0% 0.0% 119.5
25.5 16.8 0 65.9% 0.0% 48.1
Multi-Family Residential
19% 0%
20 3.8 0 19.0% 0.0% 948.9
20 3.8 0 19.0% 0.0% 948.9
20 17.25 0 86.3% 0.0% 181
Commercial, Industrial, and Community Use
5% 0%
17.8 0.89 0 5.0% 0.0% 786.6
17.8 0.89 0 5.0% 0.0% 1339.2
17.8 9.5 0 53.4% 0.0% 579.5
Key
The LT Info Stormwater Tools will be used to check the parcel BMP percentages annually for the EIVphIReg3 BMP Registration. If/when the percentages appear to change, Washoe County will alert TRPA that a follow up BMP Recertification may be beneficial for all parties.
The LT Info Stormwater Tools will be used to check the parcel BMP percentages annually for the EIVph1reg3 BMP Registration. If/when the percentages appear to change, Washoe County will alert TRPA that a follow up BMP Recertification may be beneficial for all parties.
Other Pollutant Control Strategies

No other pollutant control strategies implemented in this registration