Basics
WCTV0001
11/22/2019
Treatment Vault
1
1
Vortechnics Model 9000 treatment vault installed with the Incline Village Tourist/Fairway Phase II WQIP in 2006, catchments IC1-C and IC2-B1. System generated note: BMP assessment type was updated and previous version of the BMP was archived on 11/22/2019.

Benchmark & Threshold Values
Observation Type Benchmark Threshold
Vault Capacity 3 ft 50 % decline from benchmark
Photos

No photos available.

Location
Assessments

This is a comprehensive list of all assessments conducted on this Treatment BMP, including assessments for the current version and the archived version(s).

Currently viewing of Download Table
Documents

No documents have been uploaded for this Treatment BMP