Basics
WCDB0031n30
11/22/2019
Dry Basin
1
1
1 ft
dry basin installed pre-2004 along SR28, treats catchments Third1, Third3, Third5a and Third6b. System generated note: BMP assessment type was updated and previous version of the BMP was archived on 11/22/2019.

Benchmark & Threshold Values
Photos

No photos available.

Location
Assessments

This is a comprehensive list of all assessments conducted on this Treatment BMP, including assessments for the current version and the archived version(s).

Documents

No documents have been uploaded for this Treatment BMP