Basics
WCDB0031n30
11/22/2019
Dry Basin
1
1
1 ft
dry basin installed pre-2004 along SR28, treats catchments Third1, Third3, Third5a and Third6b. System generated note: BMP assessment type was updated and previous version of the BMP was archived on 11/22/2019.

Benchmark & Threshold Values
Photos

No photos available.

Location
Assessments

This is a comprehensive list of all assessments conducted on this Treatment BMP, including assessments for the current version and the archived version(s).

Currently viewing of Download Table
Documents

No documents have been uploaded for this Treatment BMP